SOLAR PV SYSTEM IS EQUIPPED
WITH RAPID SHUTDOWN.
TURN RAPID SHUTDOWN SWITCH TO
THE „OFF“ POSITION TO SHUT DOWN
CONDUCTORS OUTSIDE THE ARRAY.
CONDUCTORS IN ARRAY REMAIN
ENERGIZED IN SUNLIGHT.
SOLAR ELECTRIC
PV PANELS
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
Warning!
The installer is responsible for the correct labeling of the PV system. The rapid
shutdown requirement of the inverter is not affected by the FRT (fault ride through) cap-
ability, so the inverter is „Grid support interactive compatible“
Warning
! This photovoltaic rapid shutdown equipment (PVRSE) does not perform all of
the functions of a complete photovoltaic rapid shutdown system (PVRSS). This PVRSE
must be installed with other equipment to from a complete PVRSS that meets the
requirements of NEC (NFPA 70) section 690.12, CEC 6 section 4-218 for controlled con-
ductors outside the array. Other equipment installed in or on this PV system may
adversly affect the operation of the PVRSS. It is the responsibility of the installer to
ensure that the completed PV system meets the rapid shutdown functional requirements.
This equipment must be installed according to the manufacturer´s installation instructions
Warning!
Risk due to unsuitable location of the inverter. Failure or limited operation of
the inverter can be the result
Location according to the information in the user manual.
Observe national regulations and guidelines for the installation of the inverter.
Self-test
A self-test of the RSD function can be performed manually or automatically. The self-test
only affects the discharge circuit of the RSD function. All other RSD circuit components
are implemented in a single-failure-proof manner.
Automatic self-test sequence:
At each start - before switching on to the public network - the discharge circuit is activ-
ated for 10 ms if the DC voltage (40 V) is sufficient and the feedback pin is checked
before and during charging.
Manual self-test sequence:
A manual self-test can be triggered by an interruption of the AC connection (e.g.: AC
breaker).
The discharge must be measured and checked using a multimeter.
Self-test error automatic: AC_SystemFailure
6
Содержание 10.0-3 208-240
Страница 2: ......
Страница 13: ...Preparation 13...
Страница 14: ...14...
Страница 20: ...1 2 20...
Страница 21: ...AC 21...
Страница 22: ...22...
Страница 31: ...DC 31...
Страница 32: ...32...
Страница 41: ...Laying Solar Net Cables 41...
Страница 42: ...42...
Страница 43: ...Data communication Lay data commu nication cables 1 2 3 4 5 22 lbf in 2 5 Nm 6 43 EN US...
Страница 45: ...1 2 1 3 TX20 10 6 lbf in 1 2 Nm 1 2 4 5 45 EN US...
Страница 46: ...46...
Страница 47: ...Finally 47...
Страница 48: ...48...
Страница 51: ...4 3 in 1 ON OFF Lock 22 1 lbf in 2 5 Nm 2 3 4 51 EN US...
Страница 52: ...22 1 lbf in 2 5 Nm 5 6 AC ON 2 ON OFF Lock 1 7 52...
Страница 55: ...Options 55...
Страница 56: ...56...
Страница 62: ...62...
Страница 63: ...Care and maintenance 63...
Страница 64: ...64...
Страница 66: ...66...
Страница 67: ...67 EN US...