Servicing the system | 5
B1650222_en | Operating instructions PE1e Pellet
63
5.5.2 Start emissions measurement
r
Activate the “Chimney-sweep mode” icon
r
Select the desired time from the menu:
immediately
r
Specify the type of measurement (
nominal load
/
partial load
)
Ä
The flue gas temperature and residual oxygen content should have
stabilised approximately 20 minutes after activation
Ä
The display will indicate that the boiler is ready for measurement as soon
as all the conditions for the measurement are fulfilled
Enter target
date
r
Enter the time of measurement (date and time)
Ä
The boiler will follow the shutdown procedure before the start of the
measurement according to the time lock and will not start up again until
the set time
Ä
NOTICE! The boiler starts 30 minutes before the start of the
measurement and is already ready for measurement at the set time!
5.6 Replacement parts
With Froling original replacement parts in your system, you are using parts that match
perfectly. As the parts fit together so well, installation times are shortened and a long
service life is maintained.
NOTICE
Installing non-original parts will invalidate the guarantee.
r
Only replace components or parts with original replacement parts.
5.7 Disposal information
5.7.1 Disposal of the ash
Austria:
r
dispose of ash in accordance with the Waste Management Act (AWG)
Other countries:
r
dispose of ash in accordance with local regulations
5.7.2 Disposal of system components
r
Ensure that they are disposed of in an environmentally friendly way in accordance with
waste management regulations in the country (e.g. AWG in Austria)
r
You can separate and clean recyclable materials and send them to a recycling centre.
r
The combustion chamber must be disposed of as builders' waste.