
4 | Installation
18
M0741021_en | Installation and operating instructions Spring blade agitator FBR
4 Installation
4.1 Transport and handling
The discharge system is part-assembled and comes packed on a pallet.
r
Follow the transport instructions on the packaging!
A door should be provided in the store or a ceiling opening in the silo for bringing in the
unit
r
Observe the stirring head diameter of 900 mm!
To prevent damage:
r
Transport components, particularly drive components, with care
4.1.1 Temporary storage
If the system is not going to be assembled immediately:
r
Store components at a protected location, which is dry and free from dust
Ä
Damp can lead to damage to individual parts, particularly in the motor!
4.2 Installation site
When planning the fuel store, you should observe the following design information:
1
2
3
4
5
6
Содержание FBR
Страница 45: ...M0741021_en Installation and operating instructions Spring blade agitator FBR 45 Notes...
Страница 46: ...46 M0741021_en Installation and operating instructions Spring blade agitator FBR...
Страница 47: ...M0741021_en Installation and operating instructions Spring blade agitator FBR 47...