
5
Initial start-up
Perform initial start-up only after all work as described in
Ä
Chapter 4
„Installation“ on page 20 has been carried out.
5.1 Switching on
n
The device must be connected to the power supply if this has not
been done already.
n
Switch on the device with the main switch (8) on the back of the
device.
n
The POWER SUPPLY lamp lights up.
5.2 Function check
CAUTION!
Only perform the function check at a speed of 100 1/
min. Use two empty grinding bowls of equal weight to
prevent too great an imbalance.
n
Open the hood (3).
n
Clamp two empty lidded grinding bowls with of the same weight.
n
Close the hood (3).
n
Set the speed on the control panel as 100 1/min. (see
Ä
Chapter 6.8
„Setting the speed“ on page 36)
n
Press START on the control panel.
n
The hood (3) is locked and the mill starts up at the preselected
speed.
Initial start-up
- 26 -