
Fristam Pumps
appropriate Allen
wrench.
g) Place the new gear-
box cover gasket and
gearbox cover on the
gearbox and secure
with the gearbox
cover bolts. Tighten
to the torque speci-
fied in Table A, page
5.
h) Re-install the oil
drain plug and vent
plug onto the gear-
box. Fill the gearbox
with oil to the center
of the oil sight glass.
Once the gearbox is assembled, the pump head can be assembled (pages 16) and the rotor to housing
clearances can be checked. Make any necessary adjustments as required.
1265000024 Rev -
Figure 30
IL-0541
Figure 9
Содержание FKL-150
Страница 31: ...FKL Series Pump 31 ...
Страница 37: ...FKL Series Pump 37 ...
Страница 39: ...FKL Series Pump 39 ...
Страница 47: ...FKL Series Pump 47 Pump Maintenance Record Date Service Performed By ...
Страница 48: ...Fristam Pumps 48 Pump Maintenance Record Date Service Performed By ...