Upper Sections Assembly 

1) Assemble a work platform, where you can stay to comfortably start assembling the next section,  

2) 

Connect two POK SPALLA intermediate vertical uprights on the sills of the current section 

[See S.H.P. page 9] 

3) Join the two upper, vertical uprights together with another two POK DAVANZ horizontal sills,  
4) Strengthen the bay by installing no. 2 PTIR L diagonal tie rods positioned in an «X» for each side, 

5) 

Install a new work platform where you can stay to comfortably start assembling the next section (if not 

available, recover the work platform beneath)

 

6) Repeat the operation from point no. 2 to point no. 5 until the last section is installed. 

Recommendations for safe assembly  

at heights over 2 metres:

 

Anchoring the mobile scaffold. 

The POKER is subject by 
law to compulsory 
anchorage. Anchorage 
should be carried out near 
the sills (red arrows). 
Use one of the anchorage 
systems indicated. 

 

Always remain inside the 
tower. 

Operator ascent and descent 
is compulsory inside the 
mobile scaffold, using the 
non-slip rungs on the vertical 
uprights or, if necessary, the climbing ladders, 
available on request. 

Having passed through the work platform, always 
ensure the trapdoor is closed. 

Always work on a work platform, protected by the 
complete guardrail, including during the assembly 
and dismantling phases. 
In the absence of a service platform with guardrail, 
ensure you are safe using a certified fall protection 
system, as learned in the specific training courses 
planned. 

To lift loads, you are advised to lift them with a 
securely tied rope; this operation should only be 
carried out inside the mobile scaffold or the 
extended base (area including the stabilising 
brackets). 

Nobody should stand under suspended loads. 

Compulsory use of fall protection system, according to law. 

Work platforms 

V

V

e

e

r

r

t

t

i

i

c

c

a

a

l

l

 

 

u

u

p

p

r

r

i

i

g

g

h

h

t

t

 

POK SPALLA

 

 
 
 
 
 
 
 

 

Trapdoor

 

Short end protection

 

P

P

O

O

K

P

P

R

R

O

O

T

T

C

C

O

O

 

Guardrail brace

 

POK PROTRAV

 

End sill

 

P

P

O

O

K

D

D

A

AVTER

 

The POKER work platform is composed of a platform  
with a trapdoor for passage. 
The work platform must be equipped with toe boards. These must be  
assembled by clicking into place; pay attention they cannot fall from above,  
when handling them or though improper assembly. 

4

 

2

 M

 

A

N

C

H

O

R

A

G

E

 

Содержание POKER

Страница 1: ...mobile scaffolding POKER POKER HD Compulsory warnings for assembly use movements and dismantling of the mobile scaffold This manual must always accompany the mobile scaffold if it must be shown to com...

Страница 2: ...2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base No 2 pieces without castors 4 8 1 1 1 1 1 1 1 POK RUOTA Castors 1...

Страница 3: ...mbing on the mobile scaffold during assembly use and after each movement always check the brackets are correctly and firmly positioned End Sill POK DAVTER Vertical Upright POK SPALLA For POKER 01 only...

Страница 4: ...ngs on the vertical uprights or if necessary the climbing ladders available on request Having passed through the work platform always ensure the trapdoor is closed Always work on a work platform prote...

Страница 5: ...e work platform so it is positioned at a distance of approx 0 58 m over the work platform manually tightening the clamps on the vertical tubes N B The anti uncoupling safety devices must be assembled...

Страница 6: ...POK DAVANZ Sill 3 0 0 2 2 4 4 6 6 POK DAVTER End Sill 2 9 2 2 2 2 2 2 2 P TIR L Diagonal tie rod 1 1 4 4 8 8 12 12 16 POK 1 2 TIR Half diagonal tie rod 0 8 0 4 0 4 0 4 0 POK BN SR Complete base in two...

Страница 7: ...m and 1 10 m over the work platform and the other brace acts as an intermediate handrail resting on the 2nd rung over the work platform so it is positioned at a distance of approx 0 58 m over the work...

Страница 8: ...on which the tower is moved must be capable of supporting the weight After each movement braking and stabilising the mobile scaffold is compulsory Also check it is perfectly vertical It is forbidden t...

Страница 9: ...llowing the instructions provided to guarantee state of the art execution and if this is in the vertical position Before each use you must ensure all the safety measures were taken to prevent accident...

Страница 10: ...main contents of specific training planned in the State Regions Agreement on the 21 December 2011 Reference Standards L D 81 9 April 2008 Consolidated Safety Act Uni EN 1004 2005 Mobile access and wo...

Страница 11: ...installation of protective equipment against falling The aforementioned equipment may present such a configuration and resistance to avoid or stop falling from workplaces at heights and prevent as muc...

Страница 12: ...when workers or loads are on them DECLARATION OF CONFORMITY It is hereby certified that the scaffold on a POKER base was constructed in compliance with Legislative Decree 81 on 9 April 2008 It is also...

Страница 13: ...ary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test person Signature Repair date Repair type Name of...

Страница 14: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test per...

Страница 15: ...the event of test OK or test NOT OK if necessary protecting from dirt by applying a strip of transparent adhesive tape Test date Part examined Test OK Test NOT OK Description of fault Name of test pe...

Страница 16: ...www frigeriospa com Frigerio Carpenterie S p A V Fermi 6 24050 Orio Al Serio BG Fax 035 525147 E mail info frigeriospa com...

Отзывы: