Base Section Assembly
1) Take two POK BN SR base components, join them with the first pair of POK SPALLA vertical uprights
2) Join two POK SPALLA vertical uprights together with a pair of POK DAVANZ
horizontal sills, turning the pawls outwards towards the scaffold.
3) Fasten the base section by coupling no. 2 long PTIR tie rods to the pawls, on
both sides to form a double X.
Brake the castors.
The Poker is a professional mobile scaffold and allows use in indoor premises and in
outdoor environments. The verticality with spirit level, or plumb line, must not be over 1°.
Always assemble the stabilising brackets as per configurations planned in these pages.
Stabilising brackets
Correct assembly of the brackets is essential for the purposes of anti-overturning safety!
The brackets should be assembled 45° to the base. If
working in contact with a wall, the only brackets in contact
should be assembled parallel to the wall.
The clamp of the bracket must be coupled on the upright
of the support bar.
The clamps must be firmly tightened.
The brackets must be well directed on the ground, which
must not be slippery.
Before climbing on the mobile scaffold, during assembly,
use and after each movement, always check the brackets
are correctly and firmly positioned.
End Sill
POK DAVTER
Vertical Upright
POK SPALLA
For POKER-01 only:
Do not access the
platform by climbing
the guardrail, rather
use
the passage
side
opening:
NO
Short stabilising brackets
POK STAFFA
The figure on the left displays the lowest configuration
assembly diagram (POK-01),
YES
To assemble the POKER-HD brackets, see page 6.
3
IMPORTANT - During assembly and dismantling of the POKER and POKER HD mobile scaffold
Each time the operator is not on a platform with regulatory safety guardrails (no.4 POK PROTRAV
guardrail braces) and the distance between their feet and the lower platform is over 2 m, it is compulsory
to use a suitable fall protection safety system (P.P.E. to EC standard)
Assembly and dismantling operations must always be carried out:
By at least two operators equipped with a rope for lifting the components and equipped with the sp ecific
P.P.E. planned: Certified helmet, fall protection harness with double connector rope equipped with energy
absorber, positioning belt with rope, safety shoes and gloves
[See specifications on page10].
Long tie rods
P TR L
Horizontal sill
POK DAVANZ
Vertical upright
POK SPALLA
Castor Ø 100 mm.
POK RUOTA
Base in no.2 pieces
POK BN SR