background image

Routine Maintenance

Cleaning the unit:

The outer cover of the Breeze indoor module can be cleaned with a damp 

cloth.

Cleaning the outdoor module can be done by rinsing the module with low 

pressure water.  Refer to friedrich.com for approved coil cleaning agents.

Cleaning the filter:  

The indoor module of the Breeze system has a washable filter that 

should be inspected and cleaned periodically.  To access and clean the 

filter follow these steps.

1.  Open the front panel by pulling on the left and right side tabs.  The 

front panel will open upward and lock into the open position.

2.  Remove the left and right air filters from the Breeze module.

3.  Wash the filters by rinsing with water or by vacuuming the dirt from 

the filter.  Allow the filter to dry completely prior to reinstalling.

4.  Reinsert both air filters.  Then, lower the front panel and snap the 

panel into place.

STEP 9 – Locate the condensate drain.

The connecting line has a built in condensate line hose that removes the moisture collected from the indoor module.  

The hose must be located in an appropriate location for drainage.  Because the hose relies on gravity to drain, it is 

important that the hose only points downward for the entire length of the hose.

If the connecting line is rolled to store the excess line as shown in Step 6, the drain line may be removed from the 

connecting line as shown below and cut to an appropriate length. 

STEP 10 – Final Preparation.  

Using the supplied connecting line clips (Item #14 in the 

Accessories List), secure the connecting line to the interior and 

exterior walls as desired.  5 retaining clips are provided from the 

factory along with standard #8 x 1 1/2” screws and wall anchors.  
For installations with the connecting line going through the wall 

(option 1) use the supplied filler gasket (Item #7 in the Accessories 

List) to plug the hole around the connecting line in the wall 

opening. Additional sealing may be desired or necessary for

proper weatherproofing.

Once the connecting line is secure and Steps 1-9 are complete, you 

may plug in the Breeze system and enjoy your new air conditioner.

1.

2.

3.

4.

STEP 9

Peel away

SCORE AND PEEL

Содержание Breeze BR1224W3A

Страница 1: ...tions for BR1224W3A 12000 24000 Btu Breeze A revolution in room cooling Friedrich Part No 96091001 Service Questions Contact Friedrich at 800 541 6645 Sales Inquiries Contact Sylvane at 800 934 9194 o...

Страница 2: ...module off of the ground 3 The fan should face away from the building 25 ft max 6 ft power cord NOTE Be sure to place your equipment with these limitations in mind 25 ft connecting line 6 ft power cor...

Страница 3: ...sold DO NOT PLUG IN INDOOR UNIT until you have completed the entire installation process CAUTION SHOCK HAZARD DO NOT PLUG IN indoor unit until all installation work is completed Connect to a single de...

Страница 4: ...red hole loca tion for pipes ducts electrical conductors and struc tural elements Relocate indoor unit mounting location as necessary to avoid interference Using a 3 hole saw drill hole through wall f...

Страница 5: ...odule on the wall bracket Hang the module at the top first and rotate it down until the module is level with the wall You may need to make adjustments to the connecting line to get the indoor module t...

Страница 6: ...sing enclosed 8 x 3 4 screw located on the top flange of the quick connect cover All Covers must be in place to operate unit SHOCK HAZARD exists without electrical access cover Cover cannot be install...

Страница 7: ...at removes the moisture collected from the indoor module The hose must be located in an appropriate location for drainage Because the hose relies on gravity to drain it is important that the hose only...

Страница 8: ...rn on the AUTO AIR SWEEP function or to set the desired angle of the airflow Airflow angle is reset each time power is turned off 8 EXTEND When on will be displayed In Cooling and Dry mode this will a...

Отзывы: