Frick LZWII-12M Скачать руководство пользователя страница 4

190.210-IOM (FEB 20)

Page 4

LAZERWELD II PLATE HEAT EXCHANGER

INSTALLATION - OPERATION - MAINTENANCE

Table 1: LZWII main components

Bolt protection

Plastic tubes that protect the threads of the tightening bolts

Carrying bar

Carries the plate pack and the pressure plate

Frame plate

Fixed steel plate with a number of port holes for the connection of the piping system. The carrying 
and guiding bars are supported by the frame plate

Guiding bar

Keeps the channel plates and the pressure plate in line at their lower end

Plate pack

Heat is transferred from one medium to the other through the plates. The plate pack consists of semi 
welded plates in pairs which form a cassette (twin plate), gaskets, and distance sheets. The measure 
of the plate pack is the measurement between the frame plate and pressure plate. Refer to the sub-
mittal drawing for this dimension

Port holes with stud 
bolt connections

Port holes through the frame plate allow the media to enter into or exit from the heat exchanger. 
Different types of connections can be used to connect the piping system to the apparatus. Threaded 
stud bolts around the port holes secure the connections to the apparatus. The port holes may be 
protected against corrosion by metal linings. The LZWII can be equipped with different connection 
types. For details, refer to LZWII drawings supplied with product

Flanged pipe  
connection

Illustration of connection type used for LZWII-4B

Pressure plate

Moveable steel plate that can contain a number of port holes for the connection of the piping system.

Covers

Used as blind flange or inspection cover at the LZWII port holes

Supporting column

Supports carrying and guiding bars

Tightening bolts

Compress the plate pack between the frame and pressure plate

Figure 1: LZWII main components 

Port hole with stud 
bolt connections

Tightening bolts

Frame plate

Distance sheets

Carrying bar

Bolt protection

Supporting column

Pressure plate

Guiding bar

Plate pack

Partition plate

Flanged pipe connection

Содержание LZWII-12M

Страница 1: ...lt in personal injury or death damage to the unit or improper operation LaZerWeld II Plate Heat Exchangers LZWII 2M LZWII 4B LZWII 4E LZWII 6B LZWII 8K LZWII 8B and LZWII 12M Check www FrickCold com f...

Страница 2: ...rranty conditions 3 Advice 3 Environmental compliance 3 Unpacking 3 Maintenance 3 Scrapping 3 Main components 3 Nameplate 5 Function 5 Identification of plate side 6 Installation Before installing 7 R...

Страница 3: ...the date when the heat exchanger was put into operation to the local FRICK Representative ADVICE Consult your local FRICK representative for information on the following New plate pack dimensions if...

Страница 4: ...ns Port holes through the frame plate allow the media to enter into or exit from the heat exchanger Different types of connections can be used to connect the piping system to the apparatus Threaded st...

Страница 5: ...fied on the assembly drawing are to be exceeded consult the supplier Figure 3 Nameplate Material No FRICK Sales Order No Tag No Optional FOR PARTS SERVICE AND AFTER MARKET ASSISTANCE CALL 1 717 762 21...

Страница 6: ...by the stamp with the letter A or the model name in some cases both at the top of the plate See Figure 4 The separate ring gaskets always point to the right when the cassette is oriented as A End cass...

Страница 7: ...awing Foundation Install on a flat foundation giving enough support to the frame Elbow To allow easier disconnection of the LZWII connect an el bow to the pressure plate using a flange directed upward...

Страница 8: ...B Figure 10 Lifting divice for LZWII 12M RAISING This instruction is valid when raising the LZWII after delivery The strap is approved for the weight of the heat exchanger to be used CAUTION The strap...

Страница 9: ...n CONNECTING TO THE SYSTEM Remove sealing blind covers from the port holes before connecting the piping system When connecting the piping system make sure the pipes do not subject the LZWII to stress...

Страница 10: ...190 210 IOM FEB 20 Page 10 LAZERWELD II PLATE HEAT EXCHANGER INSTALLATION This page is intentionally left blank...

Страница 11: ...levels might be lower than any elasto meric materials can seal against In applications where the field side is used for a two phase refrigerant for example cascade CO2 NH3 ap plications it is very im...

Страница 12: ...e LZWII drawing and identification plate SHUT DOWN If several pumps are included in the system make sure you know which one to stop first 1 Slowly close the valve controlling the flow rate of the pump...

Страница 13: ...ARNING Use proper protective equipment such as safety boots safety gloves and eye protection when using the cleaning agents WARNING Corrosive cleaning liquids can cause serious injuries to skin and ey...

Страница 14: ...iding surfaces of the carrying bar and clean and grease it 4 Mark the cassette assembly on the outside with a diagonal line 5 Measure and note the dimension A NOTICE Brush the threads of the tightenin...

Страница 15: ...es do not need to be removed if cleaning is done using only water or without cleaning agent WARNING The plate pack may still contain a small residual amount of liquid after draining Depending on the t...

Страница 16: ...ts and ring gaskets affixed to the cassettes using glue free Clip on tabs NOTICE Before removing the old gaskets check how they are placed and attached Especially the end cassette gasket configuration...

Страница 17: ...t place ment of the respective cassette type can be advised by your FRICK representative 6 Close the heat exchanger see Closing Glued gaskets Use glue recommended by FRICK Separate gluing instruc tion...

Страница 18: ...ter that bolts are tightened alternately and diago nally Check the dimension A during tightening at the positions of the bolts that are being used NOTICE For the final tightening alternate between bol...

Страница 19: ...representatives reserve the right to in spect the storage space and or equipment whenever necessary until the date of expiry of the warranty period stipulated in the contract Notification has to be gi...

Страница 20: ...vice for an extented period of time for example longer than one year the risk of leakage when starting up increases To avoid this problem let the gasket rubber rest and regain most of its elasticity 1...

Страница 21: ...190 210 IOM FEB 20 Page 21 LAZERWELD II PLATE HEAT EXCHANGER MAINTENANCE Notes...

Страница 22: ...ynesboro PA 17268 1206 USA Phone 717 762 2121 FAX 717 762 8624 www johnsoncontrols com FRICK Form 190 210 IOM 2020 02 Supersedes NOTHING Subject to change without notice Published in USA 02 20 PDF 202...

Отзывы: