140.960-IOM (JUN 2016)
Page 7
IDCF & IDC3 EVAPORATIVE CONDENSERS
INSTALLATION
Figure 7b. – Coil Casing Section Three-Piece Lift
W
H
Figure 7c. – Mechanical Section Three-Piece Lift
W
H
Foam
Seal
Tape
5/16” Self
Tapping
Screw
Mechanical
Section
Coil
Casing
Figure 8 – Mechanical/Coil Casing Assembly
for Optional Three-Piece Rigging
Rigging of Containerized Units (0709 and 0718 units)
1. Remove the unit from the container using the pulling lugs as
shown in Figure 9.
2. Containerized units ship in two parts within the container,
where the mechanical section is bolted to the lower
section and the coil casing section is separate. Once the
unit is removed from container, remove the bolts holding
the mechanical section to the lower section and remove the
mechanical section from the lower section.
3. Remove any motors or accessories shipped in the lower
section.
4. Install rigging alignment pins on the water basin in the loca-
tions shown in Figure 4. Secure the alignment pins using the
1/2” hardware provided.
5. Position the lower section on the unit support and bolt into
place.
6. Follow steps 6 – 11 on previous page.
7. The motor for containerized units ships loose. Attach the
motor to the fan section per “Motor Installation for External
Motors."
8. Follow steps 12 – 16 on previous page.
9. Secure the pump/piping assembly to the basin using the flat
butyl sealer tape
(Part#: BAC554000)
and bolts provided as
shown in Figure 10. Apply the sealer tape as shown in Figure
10, Detail B.
10. Secure the pump piping to the pump piping bracket with the
U-bolt provided.
11. Position the rubber sleeve connecting the sections of the
pump discharge pipe and secure with the hose clamps
provided.
Figure 9 – Removing Unit from Container
Using Pulling Lugs