140.960-IOM (JUN 2016)
Page 22
IDCF & IDC3 EVAPORATIVE CONDENSERS
INSTALLATION
FILL ACCESS PLATFORM SIDE LADDER
1. Attach the upper ladder supports LA7 to the ladder if not already installed and then attach the ladder assembly to the platform
using the 3/8” x 2 1/4” bolts provided. See Detail B.
2. Secure the ladder flares to the platform railing posts using the 5/16” x 3 1/2” bolts provided. See Detail A.
3. Install the lower ladder support per Detail C, as follows:
–– Secure the standoff channels PDI to the factory installed support channel using the 3/8” x 1 1/4” bolts provided.
–– Secure the standoff channels PDI to the ladder with the ladder clamps PDC using the 3/8” x 1 1/4” bolts provided.
–– Install the cross brace using the 3/8” x 1 1/4” bolts provided.
Figure 30 – Fill Access Platform Side Ladder – All units
Detail C
PDI
Cross Brace
PDC
Detail B
LA7
Detail A