4
K
SOCKET
BUTTON HEAD
BOLT M6*20mm
K
SOCKET BUTTON
HEAD BOLT
M6*20mm
J
FOOT
O
POST FOOT
Step 6:
Attach
J
feet to
B
column leg with
K
(4) socket button head bolts, M6*20mm.
Tighten bolts securely. Repeat step 6 with
other two legs
Step 6a:
With option of
Post foot
: Attach
O
post
foot to one column leg
with
K
(4)
socket button head bolts, M6*20mm.
Tighten bolts securely. Repeat step 6
with other two legs
Step 5:
Remove
C
pad after leg installation, then reuse for assembly of other leg(s)
repeating steps 3 & 4.
Remove pad when done.
Step 7
: Place all 3 leg assemblies on worksurface and insert
E
center rails into
D
crossbeams as shown. Hole on center rails should be centered between
crossbeams. Center leg assemblies on the worksurface. Make sure your overhang
is even on all three sides.
A
B
IMPORTANT:
Make sure column legs are sitting perfectly flat against the
worksurface
E
CENTER
RAILS
Base is:
A
- 40”-68”
B
- 36”-54”
•
Maximum recommended top: 54”x78”
•
Minimum recommended top: 36”x40”
•
Install My-Hite tops 4” from the back of the base when using 29”+
depth tops is recommended.
Step 4:
Use
4
socket button head bolts, M6*12mm to secure side bracket, column leg and
crossbeam together as shown in detail.