APCO RT Installation
APCO RT is usually installed on the supply
side duct just above the air system (upstream
of a humidifier). It can also be installed on
the return side if necessary.
Orient so the air flows past the UV light first
before the carbon. Position the unit so the
UV light does not shine directly on non-uv-
resistant materials (filters, humidifiers, flex
duct, etc.). Ideally the UV light shines on the
coil.
For dual systems select a remote UV light
location that shines on the greatest surface
area or the area with the most microbial
growth. Refer to the Optional Remote UV
Light section for installation instructions.
Air Handler
Optional
2nd UV Lamp
Filter media
Furnace
Optional
2nd UV
Lamp
Humidifier
APCO RT in return duct
with light shining away
from filter media
Typical Installation Locations
APCO RT Parts List
A
Main Unit
B
In-D
uc
t A
ir P
uri
f ier
Power Cord (ER Model)
C
Duct Mount Plate
D
Duct Mount Gasket
Optional 2nd UV Light (Dual)
V
PART:
TUVL-115P
LIFE:
1 Year
W
PART:
TUVL-215P
LIFE:
2 Year
X
WARNING
Panelsticker
Y
WARNING
Sight Glass
Z
Magnet mount
Small Parts
E
Self-tapping Screws
F
Machine Screws
(for cover)
G
Quick Nut (plastic)
H
Tap-in Connector
I
Spade Connector
UV Lamps
J
PART: TUVL-111 LIFE: 1 Year
K
PART: TUVL-211 LIFE: 2 Year
Power Supply
N
ER Power Supply
O
ST Power Supply
P
SI/DI Power Supply
1. Use gasket
D
to trace cut-line onto duct.
2. Cut hole in sheet metal or duct board.
IMPORTANT!
Remove and dispose of
cut-out piece of material.
3. For sheet metal duct secure mounting plate
C
to
sheet metal ducts using self-tapping screws
E
.*
4. Remove paper backing from one side of gasket and
fix gasket to the back of the mounting plate.
5. Remove paper backing from back of gasket then fix
mounting plate and gasket to the duct.
6. Bend mounting plate flanges around the edges of
the hole to secure mounting plate. For duct board
use tape on edges of mounting plate for air leaks
and additional hold.
1.
4.
2.
5.
6a.
6b.
3.
STEP 1: APCO RT Duct Mounting
* To install without backing plate use (4) self-tapping screws.
1. Fit the APCO® RT Main Unit through hole in duct.
If attaching directly to metal duct use (4) Self-
tapping Screws. If the Backing Plate is used fit the
unit over the threaded posts and use (4) Quick
Nuts to secure it.
2. Insert UV Lamp.
3. Mount UV Lamp using (2) Quick Nuts and
attach lamp connector (be sure to align the four
connector pins).
4. Attach the cover with machine screws.
2.
3.
F
G
1.
STEP 2: APCO RT Power Unit & UV Lamp Mounting
APCO® RT
SI/DI
ST/DT
120-277 VAC
POWER SUPPLY
UV LAMP
4 PIN
CONNECTOR
L1 - BLACK
L2 or N - WHITE
GND - GREEN
Optional 2nd UV Lamp
APCO® RT ER
24 VAC
POWER SUPPLY
UV LAMP
BLACK
4 PIN
CONNECTOR
RED
24 VAC TRANSFORMER
COMMON / BLUE
HOT / RED
STEP 3: Connecting APCO RT to Power
IMPORTANT
Before connecting to power confirm which APCO® RT model is being installed. Turn off main
power source before installation. Model information is printed on the Power Unit cover.
IMPORTANT! Must be wired to constant power - do not connect to blower relay.