The information in this publication is provided for reference only. While every effort has been made to ensure the 

reliability and accuracy of the information contained in this manual at the time of printing, we recommend that you 

refer to “franklinfueling.com” for the most current version of this manual. All product specifications, as well as 

the information contained in this publication, are subject to change without notice. Franklin Fueling Systems does 

not assume responsibility and expressly disclaims liability for loss, damage, or expense arising out of, or in any 

way connected with, installation, operation, use, or maintenance by using this manual. Franklin Fueling Systems 

assumes no responsibility for any infringement of patents or other rights of third parties that may result from use 

of this manual or the products. We make no warranty of any kind with regard to this material, including, but not 

limited to, the implied warranties of merchantability and fitness for a particular purpose.
Copyright © 2021 Franklin Fueling Systems, LLC, Madison, WI 53718. All world rights reserved. No part of this 

publication may be stored in a retrieval system, transmitted, or reproduced in any way, including, but not limited 

to, photocopy, photograph, magnetic, or other record, without the prior written permission of Franklin Fueling 

Systems.
UPP and GEMINI are registered trademarks of Franklin Electric Company, Inc,

CONTACT INFORMATION

franklinfueling.com

3760 Marsh Rd. • Madison, WI 53718 • USA

Tel: USA & 1 800 225 9787 • Fax: +1 608 838 6433

Tel: UK +44 (0) 1473 243300 • Tel: Mex 001 800 738 7610

Tel: DE +49 6571 105 380 • Tel: CH +86 10 8565 4566

CONVENTIONS

NOTE

: Provides helpful information, instructions to avoid damaging equipment, or potential environmental hazards.

 

WARNING:

 Indicates a potentially hazardous situation that could result in injury or death if not avoided.

SAFETY

Franklin Fueling Systems (FFS) equipment is designed to be installed in areas where volatile liquids such as 

gasoline and diesel fuel are present. Working in such a hazardous environment presents a risk of severe injury or 

death if you do not follow standard industry practices and the instructions in this manual. Before you work with 

or install the equipment covered in this manual, or any related equipment, read this entire manual, particularly the 

following precautions:

 

WARNING:

 Use only original FFS parts. Substituting non-FFS parts could cause the device to fail, which could 

create a hazardous condition and/or harm the environment.

 

WARNING:

 Follow all codes that govern how you install and service this product and the entire system. Always 

lock out and tag electrical circuit breakers while installing or servicing this equipment and related equipment. A 

potentially lethal electrical shock hazard and the possibility of an explosion or fire from a spark can result if the 

electrical circuit breakers are accidentally turned on while you are installing or servicing this product. Refer to this 

manual (and documentation for related equipment) for complete installation and safety information.

 

WARNING:

 Before you enter a containment sump, check for the presence of hydrocarbon vapors. Inhaling 

these vapors can make you dizzy or unconscious, and if ignited, they can explode and cause serious injury or 

death. Containment sumps are designed to trap hazardous liquid spills and prevent environmental contamination, 

so they can accumulate dangerous amounts of hydrocarbon vapors. Check the atmosphere in the sump regularly 

while you are working in it. If vapors reach unsafe levels, exit the sump and ventilate it with fresh air before you 

resume working. Always have another person standing by for assistance.

 

WARNING:

 Follow all federal, state, and local laws governing the installation of this product and its associated 

systems. When no other regulations apply, follow NFPA codes 30, 30A, and 70 from the National Fire Protection 

Association. Failure to follow these codes could result in severe injury, death, serious property damage, and/or 

environmental contamination. 

Содержание UPP PIPING

Страница 1: ...UPP PIPING INSTALLATION GUIDE ...

Страница 2: ...ETY 1 SITE PREPARATION 2 UNDERGROUND FUEL PIPE SYSTEMS 3 UNDERGROUND FUEL PIPE CONSTRUCTION 4 TRANSIT OFF LOADING AND STORAGE 5 STORAGE ON SITE 5 UNCOILING PIPE 6 CUTTING STRAPS 6 PIPE BURIAL GUIDELINES 7 PRESSURE TESTING 10 TESTING GUIDELINES 10 RECOMMENDED PIPE TEST PROCEDURE 11 ...

Страница 3: ...ent is designed to be installed in areas where volatile liquids such as gasoline and diesel fuel are present Working in such a hazardous environment presents a risk of severe injury or death if you do not follow standard industry practices and the instructions in this manual Before you work with or install the equipment covered in this manual or any related equipment read this entire manual partic...

Страница 4: ...ty guidelines given on the chemical containers themselves or on any accompanying literature WARNING Some installation of UPP products may occur in confined spaces where a lack of oxygen and a concentration of toxic vapors is likely to be experienced WARNING Such working conditions are dangerous and all local health and safety guidelines for working in such environments should be followed WARNING E...

Страница 5: ...CLAMP A Electrofusion Entry Seal Clamps for PE sumps 303 CLAMP 1 304 CLAMP Properly sized hole saws for FEB or EIF entries Fiberglass Entry Boots FEB 075 Entry Seals use a hole saw HS3 58 92 mm 3 FEB 110 Entry Seals use a hole saw HS5 140 mm 5 FEB 125 Entry Seals use a hole saw HS5 140 mm 5 Electrofusion Entry Seals 303 Entry Seals use a hole saw HS3 102mm 4 304 Entry Seals use a hole saw HS5 140m...

Страница 6: ...f the pipe is High Density Polyethylene HDPE grade PE100 that allows the use of electrofusion couplers and fittings to construct a variety of pipeline configurations HDPE PE100 has well proven resistance to stress cracking puncture scratch impact microbial and rodent attack The intermediate tie layer causes a permanent bond to occur between the polyethylene and the liner material The liner of UPP ...

Страница 7: ...y wedges The bottom layer of pipes should be laid on timber battens at 1m 3ft centres to avoid any damage from sharp objects lying on the ground Pipe crates should be stored on clear level ground and should never be stacked more than three crates high Coils should be stored on firm level ground that has suitable protection for the bottom of the coil Primary pipe and UL double wall pipe can be stac...

Страница 8: ... be release in an uncontrolled fashion Staking is required every 1m to hold coil in place during relaxation period Once a coil is completely uncoiled the far end of the coil must be secured to a stable anchor point Coil Weights RELAXINGAND ROUTING Staking coil Metal or wood stakes at least 1 2 meter in length and at least 30 mm x 30 mm are recommended for every 1 meter of coiled pipe Stakes should...

Страница 9: ...prominent hook that can be partially removed when weight is placed on it bags of sand or pea gravel or use the hook end to your advantage when turning direction into a chamber or pump sump PIPE BURIAL GUIDELINES Recommended burial depth of UPP pipe is a minimum of 300 mm 12 All trenches should be sloped back towards the storage tanks The fall back slope for all pipework to the tank chambers should...

Страница 10: ...any thermal expansion will be accounted for by following our guidelines for spacing backfilling and ensuring runs are snaked Pipes should be separated from each other by at least the diameter of the largest pipe If pipe runs cross they must be separated by at least as much backfill material as the diameter of the largest pipe or protected using at least 25mm 1 of expanded polystyrene NOTE If used ...

Страница 11: ...t 5 Double Wall Pipe EN14125 40 32mm 1 63 50mm 1 75 63mm 2 110 90mm 3 125 110mm 4 0 5 m 1 ft 7 0 75 m 2 ft 6 0 9 m 3 ft 1 35 m 4 ft 5 1 65 m 5 ft 5 Single and Double Wall UL971 Pipe 63mm 2 90mm 3 63 50mm 1 75 63mm 2 110 90mm 3 125 110mm 4 1 m 3 ft 3 3 m 9 ft 10 1 m 3 ft 3 1 m 3 ft 3 4 m 13 ft 2 4 m 13 ft 2 PIPE DETECTORTAPE UPP Detectable tape is used to allow the piping location to be found after...

Страница 12: ... 50 of scale on gauge e g if the test pressure is 1 Bar 14 5 psi use a 2 bar 29 psi gauge Gauges should have serial numbers and be tested and certified every year Pressure testing equipment should have fitted a relief valve set at around 0 5bar 7 25 psi above the test pressure General Guidelines When applying pressure from gas cylinders use suitable valves to ensure test pressure is not exceeded A...

Страница 13: ...g set at 11bar 159 psig Conditioning Phase Fill the pipe work system to be tested with water making sure that any air relief valves are opened while filling the pipe work After filling the pipe work wait 1 hour for the temperature to stabilize Pressurize the system to 10 bar 145 psi and maintain this pressure for 30 minutes System pressure shall be maintained by means of refilling in order to comp...

Страница 14: ...ressure inside primary pipe 1 bar Test Procedure Record Temperature and Pressure at start of each test time Condition and test the piping as follows 1 Pressurize the piping to 10 of test pressure hold pressure for 30 minutes and inspect for leakage or pressure drop 2 Increase pressure to 50 of test pressure and again inspect for leakage while holding pressure for 30 minutes 3 Increase pressure to ...

Страница 15: ...lts on this Sump Inspection Register and have the fault s corrected at the time found You can download this form part number 408001011 from the FFS website at www franklinfueling com End user proprietary inspection check register logs or any form to record these inspections is acceptable ...

Страница 16: ...408001016 r7 ...