INSTALLATION

Well Test

4

• If using plastic pipe, refer to manufacturer’s recommendations for depth and pressure.
• Keep pipes clean and free from debris and use pipe sealant on all fittings.

5. Install system check valves.

IMPORTANT:

 Install only positive sealing check valves. Never use swing type check valves.

• For installations more than 100 ft (60m), install check valves in the drop pipe at intervals of 100 

ft (60m) or as specified by the manufacturer.

• Install an inline check valve in the discharge line within 25 ft of the pump and below the draw-

down level of the water supply.

• If permitted by local codes, install a relief valve between the wellhead and the pressure tank.
• 4" submersible pumps with a 1-1/4" or 2”discharge contain a spring-loaded removable poppet 

style check valve assembly. Refer to

 

“Maintenance” on page 5

 to remove valve for drain back.

6. Install a torque arrestor just above the pump.
7. Fasten the electrical cable to the drop pipe with clamps or appropriate tape every 10 ft (3m).

• Take care not to scrape or pinch the cable against the well casing.
• Keep the cable slack when using plastic drop pipe to allow for stretching.
• Use an ohmmeter or megger to make insulation and continuity checks.

8. Lower pump at least 5 ft (1.5m) from bottom of well and above well screen or casing perforations.
9. Test the well. Refer to 

“Well Test” on page 4

.

10. Place a sanitary well seal or pit-less adapter over top of well per manufacturer’s recommendations.

Well Test

1. Install a partially opened gate valve on the end of the pipe. 
2. Start the pump and slowly open valve to full flow.
3. If the discharge water is not clear within 30 minutes, stop pump and take necessary steps to correct.
4. Close valve until maximum required system flow rate is obtained.
5. Ensure the pump output is not greater than the yield of the well (low-yielding) by monitoring the 

well draw-down level at the maximum system flow rate.
• Refer to 

“Low-Yielding Well” on page 4

 

to correct issue.

Low-Yielding Well

1. Install a smaller pump. Consult licensed water systems professional contractor for sizing.
2. Install additional length of drop pipe to place pump lower in well.
3. Install a Franklin Pumptec or similar electronic run dry sensor.
4. Install a floatless liquid level control to work with the pressure switch.
5. Install a flow control valve in the discharge line upstream from the pressure switch to restrict output.

• A pressure tank with a bonded diaphragm, air cell, or water bag is recommended.

6. Install a low-pressure cut-off switch.

Risk of damage to pump or other equipment.

Never run pump unless it is completely submerged in water to avoid pump and motor damage

Air drawn into the pump can cause an airlock under certain conditions.

Содержание E Series

Страница 1: ...r operation procedures and all applicable codes may result in the following hazards Risk of severe injury or death by electrical shock Ground motor before connecting to power supply To reduce risk of electrical shock disconnect power before working on or around the system More than one disconnect switch may be required to de energize the equipment before servicing Wire pump system for correct volt...

Страница 2: ...ere is an adequate flow of water over the motor for cooling purposes is ensured Determine the correct pump setting from the driller s record taking into account the static water level and the draw down at the proposed pumping rate Pressure Tank Pressure Switch Gate Valve Service Pipe Pressure Gauge Pressure Relief Valve Spring Loaded Check Valve See Wiring Diagrams Sanitary Well Seal or Pitless Ad...

Страница 3: ...nd apply power momentarily 8 Ensure pump rotation is clock wise when viewed from pump discharge 9 Place the motor and pump labels in the circuit breaker box for future reference Physical Installation Refer to Typical Installation on page 2 1 Confirm that the motor s lead wires are secure under the pump s lead guard 2 Install a pressure tank per manufacturer s recommendations 3 Attach a 3 16 diamet...

Страница 4: ... well and above well screen or casing perforations 9 Test the well Refer to Well Test on page 4 10 Place a sanitary well seal or pit less adapter over top of well per manufacturer s recommendations Well Test 1 Install a partially opened gate valve on the end of the pipe 2 Start the pump and slowly open valve to full flow 3 If the discharge water is not clear within 30 minutes stop pump and take ne...

Страница 5: ...trical rating of the motor For 3 wire single phase pumps check the control box Incorrect rotation 3 phase Interchange any two leads at the magnetic starter Pump cycles too fre quently Pressure drop between pres sure switch and tank Check system for a plumbing leak and correct as necessary Cut in or Cut out pressure too high Follow manufacture s instructions to properly set the on off cycle of the ...

Страница 6: ...ting ft m Drop Pipe Size Wire Size pump to control box Wire Size control box to power source Horizontal Offset between well house Materials of Construction 3 Phase Panel Info Standard Soft Start or VFD Power Supply Options Utility Generator or Alternative Energy Source Make of Pump Amps HP Volts Ph Make of Control Box HP Volts Power Supply Volts HZ Pressure Switch PSI Cut in Cut out ...

Страница 7: ...NOTES ...

Страница 8: ...800 348 2420 franklinwater com For technical assistance parts or repair please contact Form 106259101 Rev 003 06 20 Copyright 2020 Franklin Electric Co Inc All rights reserved ...

Отзывы: