EN
9
9
Flue assembly - Mounting the hood body
• Position the upper chimney section and fix the upper part
to the frame using the 2 screws
12c
(2,9 x 6,5) provided.
• Similarly, position the lower chimney section and fix the
lower part to the frame using the 2 screws
12c
(2,9 x 6,5)
provided.
Before fixing the hood canopy to the frame:
• Screw the 2 screws
12f
half way into the holes provided
in the sides of the bottom of the frame.
• Remove the grease filters from the hood canopy.
• Remove any activated charcoal filters.
• Lift the hood canopy and engage the screws
12f
in the
slots (
A
) as far as they will go.
• Working from below, fix the hood canopy to the frame
(
B
), using the 4 screws
12q
and 4 washers
22
provided,
then tighten all the screws securely.
ELECTRICAL CONNECTION
• Connect the Hood to the Mains Power Supply, inserting a
bipolar switch with a contact aperture of at least 3 mm.
• Remove the Grease filters (see paragraph “Maintenance”)
and make sure that the Power cable (
A
) has been properly
inserted into the Suction fan socket.
• Fasten the connector
B
to the free socket at the side of the
suction fan
A
B
Содержание FDF 12274 I XS
Страница 4: ...EN 4 4 CHARACTERISTICS Dimensions 650 min 45...
Страница 14: ...IT 1 14 CARATTERISTICHE Ingombro 650 min 45...
Страница 24: ...FR 2 24 CARACTERISTIQUES Encombrement 650 min 45...
Страница 34: ...DE 3 34 CHARAKTERISTIKEN Platzbedarf 650 min 45...
Страница 44: ...TR 4 44 ZELLIKLER Boyutlar 650 min 45...
Страница 54: ...CZ 5 54 HLAVN PARAMETRY Prostorov rozm r 650 min 45...
Страница 63: ......
Страница 64: ...991 0282 579_ver1...