![Franke FDF 12274 I XS Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/franke/fdf-12274-i-xs/fdf-12274-i-xs_instructions-for-use-and-installation_2327137006.webp)
EN
6
6
INSTALLATION
Drilling the Ceiling/shelf and fixing the frame
DRILLING THE CEILING/SHELF
• Use a plumb line to mark the centre of the hob on the ceiling/support shelf.
• Place the drilling template
21
provided on the ceiling/support shelf, making sure that the
template is in the correct position by lining up the axes of the template with those of the hob.
• Mark the centres of the holes in the template.
• Drill the holes at the points marked:
• For concrete ceilings, drill for plugs appropriate to the screw size.
• For hollow brick ceilings with wall thickness of 20 mm: drill ø 10 mm(immediately insert
the Dowels
11
supplied).
• For wooden beam ceilings, drill according to the wood screws used.
• For wooden shelf, drill ø 7 mm.
• For the power supply cable feed, drill ø 10 mm.
• For the air outlet (Ducted Version), drill according to the diameter of the external air ex-
haust duct connection.
• Insert two screws of the following type, crossing them and leaving 4-5 mm from the ceiling:
• For concrete ceilings, use the appropriate plugs for the screw size (not provided).
• for Cavity ceiling with inner space, with wall thickness of approx. 20 mm, Screws
12h
,
supplied.
• For wooden beam ceilings, use 4 wood screws (not provided).
• For wooden shelf, use 4 screws
12g
with washers
22
and nuts
23
, provided.
Содержание FDF 12274 I XS
Страница 4: ...EN 4 4 CHARACTERISTICS Dimensions 650 min 45...
Страница 14: ...IT 1 14 CARATTERISTICHE Ingombro 650 min 45...
Страница 24: ...FR 2 24 CARACTERISTIQUES Encombrement 650 min 45...
Страница 34: ...DE 3 34 CHARAKTERISTIKEN Platzbedarf 650 min 45...
Страница 44: ...TR 4 44 ZELLIKLER Boyutlar 650 min 45...
Страница 54: ...CZ 5 54 HLAVN PARAMETRY Prostorov rozm r 650 min 45...
Страница 63: ......
Страница 64: ...991 0282 579_ver1...