6 | Installation
Franke Kaffeemaschinen AG
32
User manual SB1200 FM CM
6
INSTALLATION
6.1
Preparations
– The mains power connection for the coffee machine must be protected by a residual current circuit-breaker
(RCCB).
– Each terminal of the power supply must be able to be interrupted using a switch.
– The mains water connection must meet the
Requirements of the water supply [
state, and local regulations.
– The coffee machine must be connected to the water supply with the supplied hose kit. Do not use any other
water hoses that happen to be present.
– Make sure to provide a stable, ergonomic cup tray (min. load capacity 150 kg). The operator panel should be at
eye level.
You must have completed these preparations before one of our service technicians can install the coffee machine
for you. Your service technician will install your coffee machine and carry out the initial commissioning process. The
technician will walk you through the basic functions.
6.2
Dimensions
All dimensions are specified in mm.
More comprehensive specifications are required for setting up the furniture. Consult the design data in this regard.
SB1200 FM CM - front/side view