background image

Page 

3

MT04-001 AquariTherm Tap (Manual)

www.dartvalley.co.uk

Re

vi

si

on N

o. M

AQ

TI

N

16

07

13

01

Page 

2

MT04-001 AquariTherm Tap (Manual)

www.dartvalley.co.uk

Re

vi

si

on N

o. M

AQ

TI

N

16

07

13

01

4.5

50

30

Step 4 : 

Preparation and Drilling

Step 3 : 

Introduction

The tap incorporates a thermoregulating cartridge to ensure users 
of consistent water temperatures.

The tap is suitable, without modification, for all types of installation, 
including pump boosted systems and mains pressure.

The valve has been designed and manufactured to comply with 
NHS D08 requirements for washbasin applications up to 41ºC high 
and high pressure designations.

The valve has been independently tested and approved as a Type 3 
valve under the TMV3 scheme with the HP-WE designation of use.  

Table 1:  Technical Specification / Condition of Use for  
Type 3 valves

Table 2: Mixed Water Temperature Approvals

NOTE:

 For washbasins, washing under running water  

is assumed. The fitting of isolation valves is required as 
close as is practicable to the water supply inlets of the 
AquariTherm. Non-return valves and strainers are fitted 
internally- see fig.13.

NOTE:

 Balanced pressures are desirable, but must be 

maintained within the ranges above. 

Maximum Static Pressure

10 Bar

Dynamic Pressure

1 to 5 Bar

Hot Supply Temperature

55-65 ºC

Cold Supply Temperature

5-20 ºC

Minimum Temperature Differential (Mix to Hot) 
for Fail-Safe

10 ºC

Temperature Stability

+/- 2 ºC

Code

HP-WE

Application

Washbasin

Mixed Water Temperature (at point of 
discharge)

41 ºC

Operating Pressure

High Pressure (1-5 
Bar)

c)   record the temperature of the mixed water at a smaller 

draw-off flow rate, which shall be measured 

d)   isolate the cold water supply to the mixing valve and 

monitor the mixed water outlet. If there is a flow stream 
after 5 seconds then collect any water discharging into a 
suitably graduated measuring vessel for 60 seconds; if the 
volume of water collected is greater than 120ml then further 
investigation is needed.

e)   If there is no flow or the volume of water collected is less 

than or equal to 120ml, then restore the cold water supply; 
after 15 seconds, record the mixed water temperature.

f)   record the equipment, thermometer etc. used for the 

measurements

Table 3: Guide to maximum stabilised temperatures 
recorded during site tests

Step 12 : 

In-Service Testing

11.1 Purpose

Since the installed supply conditions are likely to be different 
from those applied in the laboratory tests it is appropriate, at 
commissioning, to carry out some simple checks and tests on 
each mixing valve to provide a performance reference point for 
future in-service tests.

11.2 Procedure

Check that:

a)   the designation of the thermostatic mixing valve matches 

the intended application 

b)   the supply pressures are within the range of operating 

pressures for the designation of the valve 

c)   the supply temperatures are within the range permitted for 

the valve and by guidance information on the prevention of 
legionella etc.

Adjust the temperature of the mixed water in accordance with 
the manufacturer’s instructions and the requirement of the 
application and then carry out the following sequence:

a)  record the temperature of the hot and cold water supplies  

b)   record the temperature of the mixed water at the largest 

draw-off flow rate 

Step 11 : 

Method for Commisioning Thermostatic Cartridge

NOTE:

 The final stabilised mixed water temperature should 

not exceed the values in Table 3

Application

Mixed Water Temperature

Washbasin

41 ºC

7

We recommend the fitting of local hot & cold full flow isolation 
valves prior to the tap if not already fitted.

Turn off hot & cold water supply. Cut pipework using a suitable 
plumbers cutting tool, remove any sharp edges, locate isolation 
valves on to pipes and tighten, make sure the new valves are in 
the off position then turn the water back on, test for any leaks.

Using a bucket open each valve individually and purge water 
through into the bucket this will remove any dirt left in the 
pipework. 

Refer to current HTM guidelines for tap positioning information, 
also ensure adequate access is given under the Spigot to 
operate integrated isolation valves.

Mark and drill a 50mm diameter hole in the wall panel where 
the tap is to be located and a 4.5mm hole for the anti-rotation 
pin (Fig. 1).  

IMPORTANT:

 The tap is supplied with an anti-rotation pin. 

Failure to fit the pin will result in void of warranty.

Fig 1

IMPORTANT:

 Plumbing compound should not be used to 

seal the pipework as oils leaching from the compound will 
prevent the TMV from functioning correctly.  

12.1  Purpose

The purpose of in-service tests is to regularly monitor and record 
the performance of the thermostatic mixing valve. Deterioration in 
performance can indicate the need for service work on the valve 
and/or the water supplies.

12.2  Procedure

Using the same measuring equipment or equipment to the same 
specification as used in the commissioning of the valve, adjust 
the temperature of the mixed water in accordance with the 
manufacturer’s instructions and the requirement of the application. 

Carry out the following sequence:

a) record the temperature of the hot and cold water supplies.

b)  record the temperature of the mixed water at the largest  

draw-off flow rate.

c)  record the temperature of the mixed water at a smaller draw-off 

flowrate, which shall be measured.

If the mixed water temperature has changed significantly from the 
previous test results (e.g.>1 K) 5), record the change and before 
re-adjusting the mixed water temperature check:

a)  that any in-line or integral strainers are clean.

b)  any in-line or integral check valves or other anti-back siphonage 

devices are in good working order.

c) any isolating valves are fully open.

With an acceptable mixed water temperature, complete the 
following procedure:

a) record the temperature of the hot and cold water supplies

b)  record the temperature of the mixed water at the largest  

draw-off flow rate.

c)  record the temperature of the mixed water at a smaller draw-off 

flow rate, which shall be measured.

d)  isolate the cold water supply to the mixing valve and monitor the 

mixed water temperature.

e)  record the maximum temperature achieved as a result of (d) and 

the final stabilised temperature.

f)  record the equipment, thermometer etc. used for the 

measurements.

If at step (e) the final mixed water temperature is greater than the 
values in Table 1 

(Step 3)

 and / or the maximum temperature 

exceeds the corresponding value from the previous results by more 
than about 2 K, the need for service work is indicated.

NOTE:

 In-service tests should be carried out with a frequency, 

which identifies a need for service work before an unsafe water 

temperature can result. In the absence of any other instruction 

or guidance, the procedure described in Annex Fof D 08 may be 

used - Annex F of D 08 (informative)

Содержание DVS AquariTherm Tap

Страница 1: ...be deferred to 24 to 28 weeks after commissioning c If small changes e g 1 to 2 K in mixed water temperatures are recorded in both of these periods necessitating adjustment of the mixed water temperature then the next in service test should be carried out at 18 to 21 weeks after commissioning d If significant changes e g 2 K in mixed water temperatures are recorded in either of these periods neces...

Страница 2: ...ng Thermostatic Cartridge NOTE The final stabilised mixed water temperature should not exceed the values in Table 3 Application Mixed Water Temperature Washbasin 41 ºC 7 We recommend the fitting of local hot cold full flow isolation valves prior to the tap if not already fitted Turn off hot cold water supply Cut pipework using a suitable plumbers cutting tool remove any sharp edges locate isolatio...

Страница 3: ...the main tap body needs to be removed from the spigot Using a 6mm slotted screw driver isolate the hot water supply by turning the integrated isolation valve 90 clockwise Fig 7 1 Follow the same procedure for the cold supply Remove the retainer screw Fig 6 and 6 1 The main tap body can now be removed to enable servicing of the filter and check valve The filter cartridges Fig 13 can be removed from...

Страница 4: ... the tap allow the tap to run and the water to get up to temperature and settle Fig 8 The temperature should be set at 41 C If the temperature is outside the range 40 42 C the TMV should be calibrated as per Step 9 Step 6 Continued Using a 2 5mm Allen key fit retainer screw Fig 6 and 6 1 Page 4 Page 5 Isolate the hot and cold water supply Carefully remove screw cover retainer screw and penny washe...

Отзывы: