background image

Page 

6

MT04-001 AquariTherm Tap (Manual)

www.dartvalley.co.uk

Page 

7

MT04-001 AquariTherm Tap (Manual)

www.dartvalley.co.uk

Re

vi

si

on N

o. M

AQ

TI

N

16

07

13

01

Re

vi

si

on N

o. M

AQ

TI

N

16

07

13

01

Step 8 : Checking the TMV Temperature  

Step 9 : TMV Temperature Calibration and Setup 

Ensure water supply is isolated and power running to the tap is 
turned on. 

Using a 6mm slotted screw driver the cold water supply is 
activated by turning the integrated water isolation valve 90º 
counter clockwise (Fig 7.1). Follow the same procedure for the 
hot supply.

Fig 7

Fig 7.1

Fig 8

Hold a thermometer under the outlet (Fig8) of the tap, this 
should start the flow of water from the tap allow the tap to 
run and the water to get up to temperature and settle (Fig 8). 

The temperature should be set at 41˚C.

If the temperature is outside the range 40-42˚C the TMV 
should be calibrated, as per Step 9.

Step 6 : 

Continued...

Using a 2.5mm Allen key fit retainer screw (Fig. 6 and 6.1).

Page 

4

Page 

5

Isolate the hot and cold water supply. 

Carefully remove screw cover, retainer screw and penny washer, 
only (Fig 9).

Remove the spindle plug (in middle of spindle head) (Fig 10).  

Fig 9

Fig 10



































Fig 6.1

Fig 6

Fit main tap body to wall spigot (Fig. 5). Ensure body is fully 
located over the spigot. 

Fig 5.1 shows the body correctly located whereas the body has 
not been fully engaged in Fig 5.2.  

Fig 5.1

Fig 5.2





































































Step 7: 

Activating the water  & power supply

SCREW COVER

RETAINER SCREW
PENNY WASHER

TOP CAP

LIMIT RING

CARTRIDGE RETAINER NUT

SPINDLE PLUG





































































Fig 5

Содержание DVS AquariTherm Tap

Страница 1: ...be deferred to 24 to 28 weeks after commissioning c If small changes e g 1 to 2 K in mixed water temperatures are recorded in both of these periods necessitating adjustment of the mixed water temperature then the next in service test should be carried out at 18 to 21 weeks after commissioning d If significant changes e g 2 K in mixed water temperatures are recorded in either of these periods neces...

Страница 2: ...ng Thermostatic Cartridge NOTE The final stabilised mixed water temperature should not exceed the values in Table 3 Application Mixed Water Temperature Washbasin 41 ºC 7 We recommend the fitting of local hot cold full flow isolation valves prior to the tap if not already fitted Turn off hot cold water supply Cut pipework using a suitable plumbers cutting tool remove any sharp edges locate isolatio...

Страница 3: ...the main tap body needs to be removed from the spigot Using a 6mm slotted screw driver isolate the hot water supply by turning the integrated isolation valve 90 clockwise Fig 7 1 Follow the same procedure for the cold supply Remove the retainer screw Fig 6 and 6 1 The main tap body can now be removed to enable servicing of the filter and check valve The filter cartridges Fig 13 can be removed from...

Страница 4: ... the tap allow the tap to run and the water to get up to temperature and settle Fig 8 The temperature should be set at 41 C If the temperature is outside the range 40 42 C the TMV should be calibrated as per Step 9 Step 6 Continued Using a 2 5mm Allen key fit retainer screw Fig 6 and 6 1 Page 4 Page 5 Isolate the hot and cold water supply Carefully remove screw cover retainer screw and penny washe...

Отзывы: