17
11-03-2014 / LSC 178 / Rev. 00
400
T
D.
Wait for the machine to reach the operating temperature, which can be visualized on the boiler pressure gauge (11) positioned on the
appliance on Compact series machine; on 2-3-4 groups machines check on the lED light display (5) for the operating temperature
(expressed in °C) pre set at the moment of the installation, to be attained.
During the heating phase, make sure that the symbols on the control panel (5) switch on progressively as the temperature rises. The
display will start to show this as soon as the temperature reaches 105 °C and w ill continue until the appliance reaches its operating
temperature (the set temperature symbol will go from flashing to fixed). Each time that the temperature drops below the preset value,
the symbol indicating the operating temperature will start to flash (heating phase) until the set temperature is reached.
E.
The appliance is ready for use.
Take note!
The operating temperature is the temperature of the boiler during normal operation.
5.1 COFFEE PREPARATION
A.
remove a filter holder (7 or 18 a according to whether 1 or 2 cups of coffee are required) from the delivery group.
B.
Fill with ground coffee, taking care not to leave any coffee powder residues on the top edge of the filter holder, then press it using
the special coffee tamper supplied.
C.
Attach the filter holder firmly.
D.
Place one or two cups below the filter holder (7 or 18 a according to whether 1 or 2 cups of coffee are required).
E.
Press any of the coffee delivery buttons (m-n-p-q) with pre-set doses (set during installation) or alternatively, use the free flow delivery
button (o).
Take note!
To stop coffee delivery earlier after using one of the buttons with pre-set doses, simply press again the same button on the
same touchpad.
Содержание COMPACT T 400
Страница 4: ...2 11 03 2014 LSC 178 Rev 00 400 T...
Страница 33: ......