4 - Unpacking and Installation Instructions
The following instructions should be read and fully understood prior to installing the equipment
to ensure that the correct procedures are followed, and all safety precautions are observed.
Note: If the equipment has been in storage for a considerable amount of time, it is
advisable to conduct a routine maintenance check on all parts before installation.
Safety Precautions
This equipment should not be connected to an electrical supply before being installed.
Installation procedures should be adhered to in order to ensure a safe working environment
and reduce the risk of damage or personal injury.
Preparing the Mounting Position
Mark out and drill the fixing holes through the deck (refer to drawing C21501). If anti-vibration
mounts are to be fitted, the fixing holes for the mounts should also be marked out and drilled.
Prior to manoeuvring the searchlight into its’ fixing position, the AV mounts should be fitted to
the base. When in the desired position, bolt the searchlight firmly down. On an uneven surface
it may be necessary to use a suitable sealant such as silicone, in order to ensure a
weatherproofed joint.
Содержание A7154
Страница 11: ......
Страница 12: ......
Страница 13: ...Back To Top ...
Страница 18: ...Back To Top ...
Страница 25: ...FBUS Speed Control Board ...
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......