
FD
9
2.4 LOCATION
Consideration must be given to the following points when determining the most suitable site/location for the
unit installation:
location arrangement in order to guarantee adequate air flow (no narrow spaces)
electrical power supply location;
accessibility for servicing/maintenance and repair of the unit and/or its components;
floor loading strength and ability to support the operating weight of the unit;
Possible objection to operating noise.
CHAPTER 3: INSTALLATION
3.1 CLEARANCES
Absolute care must be taken to ensure adequate air volume to the air intake and fan discharge, and to avoid air
recirculation through the unit that will deeply reduce its performances.
For these reasons it is necessary to observe the following clearances (see the pictures in the following pages):
-
air folter suction side: 0,5 mt min.
-
fan side: 0,8 mt min.
-
electric board side: 0,8 mt min.
-
top side: 0,2 mt min.
Top side
0,2 mt. min.
Supply side
0,8 mt. min.
Electric
board side
0,8 mt min.
Suction side
0,5 mt. min