2.  Function 

The  EMG  1500–PN  Gateway  serves  as  interface  between  the 
Ethernet and the FRAKO Starkstrombus

®

 

2.1  Operating principle of the EMG 1500-PN 

Polling  signals  are  sent  to  the  EMG  1500-PN  via  the  Ethernet. 
These  are  converted  into  polling  commands  in  the  FRAKO 
Starkstrombus

®

.  The  response  from  the  instrument  addressed  is 

then  returned  via  the  Ethernet.  The  EMG  1500-PN  Gateway  is 
capable of serving several Ethernet connections simultaneously. 
 

2.2  Communication with the EMG 1500-PN 

Various  programs  and  devices can be linked to the EMG 1500-PN 
Gateway. 

• 

The SYSTEM-SW is used to configure the EMG 1500-PN. 

• 

The EMIS 1500 central unit uses the EMG 1500-PN to access 
the individual instruments in the Energy Management System 
and collect their data. 

• 

The  Setup  programs  for  the  individual  EM  (Energy 
Management)  instruments  such  as  EMA-SW,  EMR-SW  or 
OPT-SW,  are  also  able  to  be  connected  to  the  appropriate 
instruments via the EMG 1500-PN. 

 

2.3  Connections 

The  EMG  1500-PN  is  provided  with  connections  for  the  power 
supply (230V AC) and three communications connections. 

• 

an RJ-45 Ethernet jack 

• 

a FRAKO Starkstrombus

®

 connection (RS 485) 

• 

an RS 232 connection (9-pin D Sub) 

 

2.4  Display 

The  EMG  1500-PN  has  4  LED  annunciators.  If  the  Run  LED 
flashes, this indicates that the instrument is working correctly. The 3 
other LEDs indicate the status of data transmission 
(see Section 5.1, page 12) 
 

Содержание EMG 1500-PN

Страница 1: ...Gateway EMG 1500 PN EMG 1500 PN Energy Management System Run Made in Germany Gateway Serial Ethernet Connect Bus error Bus Operating manual EMG 1500 PN...

Страница 2: ...ollow the operating manual The installation and commissioning may only be carried out by appropriately qualified personnel with due regard for all rules and regulations that are in force The instrumen...

Страница 3: ...Connection to the FRAKO Starkstrombus 7 3 2 4 RS 232 connection 8 4 Commissioning 9 4 1 Preparations before commissioning 9 4 2 Instrument self test 9 4 3 Assigning an IP address 9 4 3 1 Assigning the...

Страница 4: ...s used to carry out all network settings i e IP address subnet mask and gateway see Section4 3 page 9 The supply voltage must then be removed from the instrument Installation The instrument is mounted...

Страница 5: ...SW is used to configure the EMG 1500 PN The EMIS 1500 central unit uses the EMG 1500 PN to access the individual instruments in the Energy Management System and collect their data The Setup programs...

Страница 6: ...ards or control cabinets When the instrument is in operation it must not be possible to touch the instrument terminals 3 2 Electrical connections The instrument is connected according to the wiring di...

Страница 7: ...shown in Figure 1 on page 6 The two poles of the two wire bus are connected to terminals A and B attention being paid to the correct polarity while the shielding is connected to the terminal The A ter...

Страница 8: ...ogether and shielded Types Manufacturer cable type order number cable Twinax 105 Lapp Unitronic Bus CAN 1x2x0 34 2170263 6 8 mm Helukabel CAN BUS 1x2x0 34 801572 6 5 mm Leoni L 02YSCY 1x2x0 34 2 0 120...

Страница 9: ...e per second 4 3 Assigning an IP address The EMG 1500 PN requires a unique IP address before it can be accessed via the Ethernet The address is assigned using the software EMG SW supplied as part of t...

Страница 10: ...there is at least one data collector of the type EMIS 1500 In addition a connection with this data collector must be in existence An additional bus coupler can be added by clicking the right mouse bu...

Страница 11: ...Max Number of masters should not be changed and should remain set at 8 Important Each bus address may only be assigned once within a bus system For larger systems it is recommended to draw up a table...

Страница 12: ...established with the EMG 1500 PN The Bus error LED indicates that there are bus related problems in the FRAKO Starkstrombus Each time this LED comes on it indicates that there has been an error in th...

Страница 13: ...has not been adopted Switch the device off and then on again After the Ethernet cable has been plugged in the device cannot be accessed During device start up no Ethernet connection could be detected...

Страница 14: ...lectrical connection as per EIA RS 485 Transmission rate 76 8 kbit sec Protocol FRAKO Starkstrombus Ethernet interface Plug RJ45 Transmission 10BaseT half duplex Mechanical design Enclosure material P...

Страница 15: ...ta 15 EMG 1500 PN Energy Management System Run Made in Germany 140 0 mm 11 4 mm 5 0 mm 59 2 mm Gateway Serial Ethernet Connect Bus error Bus 44 8 mm 35 0 mm 90 0 mm 4 5 mm Figure 3 Enclosure dimension...

Страница 16: ...e filters Dynamic compensation of harmonics Reactive power control relays Maximum demand control systems Mains monitoring instruments Cost allocation Energy management systems Sales programme EMG 1500...

Отзывы: