Anchor positions
IV-2 FRSM-8000 user's guide 09/2002 ©FRACO Products Ltd
IMPORTANT
1-With a ground base, the first anchor
must be installed before:
Elevating the platform
2-Load the platform only with the mast
sections required to reach the next anchor.
3-In a work situation, the platform must
never go above the last anchor.*
FIRST ANCHOR:
6 m (20') maximum from the ground
OTHER ANCHORS:
Maximum 6 m (20') between
the anchors
*-TO INSTALL THE ANCHORS ONLY, it is
permited to exceed the last anchor by 6 m
(20') with a load less than 1 364 kg
Placing any load on the platform
(3 000 lbs), two men and tools when the
first anchor is installed.
Содержание FRSM-8000
Страница 3: ......
Страница 10: ...Part II Installing the platform...
Страница 30: ...Part III Options Miscellanous...
Страница 35: ......
Страница 36: ...Part IV Mast and anchor installation...
Страница 50: ...Part V Operating the platform...
Страница 58: ......