IN-VA07-B001-00
- 19 -
© Future Products Group
Location
VISAIR CABINETS
-
INSTALLATION
Ventilation
The front louvers and vents located on the top of the cabinet must never be
obstructed. If obstructed the cabinet may overheat and cause an electrical
malfunction.
If the cabinet is installed in an alcove, or under any structure, a minimum
clearance space of 200mm must exist above the cabinet top.
Before use, operate the cabinet for 1-2 hours to remove any fumes or odours,
which may be present.
Draughts
The door-
less cabinet features an “air curtain” to retain the cold air within the
cabinet. A “curtain” of cold air falls from a linear vent, across the top of the open
cabinet front, to be re-circulated through the evaporator cooling coils.
The cabinet should not be sited where strong draughts will deflect the “air
curtain”. If this happens, excess condensation will form on the products, and
cooling will be less effective.