Part No. 30911 Rev. A September 2020
- 18 -
Visair Refrigerated Cabinets
INSTALLATION
Regulations
VISAIR CABINETS
-
INSTALLATION
Compliance
with Local
Requirements
It is very important that your food cabinet is installed correctly and is operating
properly before use. Installation must comply with local electrical, health &
safety and hygiene requirements.
Setting Up
VISAIR CABINETS
-
INSTALLATION
Unpacking
Unpack and check unit for damage and report any damage to the carrier and
supplier. Report any deficiencies to your supplier.
Cabinet
Preparation
Remove all tapes, ties and packers, used to prevent movement during transit.
Pull the base drawer open to check for packing materials in the well.
Positioning the
Cabinet
Position the cabinet in its
allocated working position
on the rollers.
If the floor is not level,
place packing under the
rollers to set the cabinet
vertical.
Once in position, wind down the stabilizers, to prevent further movement.
Power Supply
and Earthing
The cabinet is fitted with a four metre mains lead.
An EMI line filter is mounted adjacent to the mains inlet. If the cabinet is to be
hard wired, this must only be done by a suitably qualified person.
Before connecting to the power supply, check that the local supply is correct to
that shown on the cabinet label.
WARNING - THE CABINET MUST BE EARTHED/GROUNDED
Isolation
If the cabinet is not connected to an outlet socket, but is hard wired to the mains
supply, a means of isolation must be provided.
If a plug and socket are used, they should still be accessible after the cabinet is
installed.