Part No.26119 Rev. G August 2018
- 22 -
Inline 3000 Series Cabinets
Condenser Unit,
remote installation
REFRIGERATED CABINETS
-
INSTALLATION
Refrigerant
Connections
(Refrigeration
Engineer)
Refrigeration pipes must be brazed between the
cabinet stubs and the condenser unit. After the
pipes have been fitted, the refrigeration engineer
will have to charge the system with R134A
refrigerant.
The charges indicated in the Specification table
may be used as a starting charge, but the final
charge will depend on the distance between the
cabinet and the condensing unit.
Temperature
Probe
(Electrician)
The condenser temperature probe is pre-connected to
the refrigeration controller, and must be inserted in the
mounting pocket on the discharge pipe of the
compressor.
Power
Connections
(Electrician)
Cable, for connection to the condenser unit, is already connected to the display
cabinet. Sufficient length is provided for spacing up to five metres.
The three-core lead without a plug should be connected to the condenser
assembly, phase, neutral and earth terminals. If the lead is not long enough to
reach the condenser location, a terminal box should be fitted close to the
cabinet, and the power feed extended to the condenser via fixed wiring.
Содержание IN 3C08
Страница 1: ...Refrigerated Cabinets Curved Format...
Страница 45: ...IN 3C08 12 15 18 45 Future Products Group...
Страница 46: ...Part No 26119 Rev G August 2018 46 Inline 3000 Series Cabinets...
Страница 47: ...IN 3C08 12 15 18 47 Future Products Group...