20
2
2-5 Install the Optional Accessory
1. Install the Water-Cooling Cap
2. Install the Extreme-Cooling Tower
First place the Extreme-Cooling Tower on the heatsink cooler, then use the screws to fasten it.
Extension Tower allows extreme overclockers to pour Dry Ice or Liquid Nitrogen. AT YOUR OWN
RISK!!
O Ring
(black rubber band)
Place the Water-Cooling Cap above O Ring and fasten four screws to fix it on the
heatsink cooler. It is for users to run water cooling on the chipset.
Before you install the Water-Cooling Cap or Extreme-Cooling Tower, you should
fasten the O Ring onto the heatsink cooler.
CA
UT
IO
N
!
screw
screw