PATIO COVER INSTRUCTION SHEETS
PATIO COVER INSTRUCTION SHEETS
STEP 5C: Setting First & Last Roof Panels (continued)
Stand up the Edge
Beam and Post Assembly, tying Posts to the ladders or with help from a few
building buddies. Square up the left end of the Edge Beam with the left end of the
Hanging Rail on the house. Set the Posts in front of your post chaulkline.
LifeRoom Optima Installation Guide
STEP 5D: Setting First Roof & Last Panels
Make sure the RIGHT end of the
3" Edge Beam (#F) is square with the RIGHT end of the Hanging Channel (#B) at
the house. Slide the first Roof Panel into the Hanging Channel tightly against the
Foam Weatherstripping with the FEMALE lock of Roof Panel on the RIGHT, having
the RIGHT edge of Roof Panel FLUSH with the right end of the 3" Edge Beam.
Содержание LifeRoom Optima
Страница 1: ...LifeRoom Optima Installation Manual www fourseasonsols com support fourseasonsols com 800 533 0887...
Страница 3: ...www fourseasonsols com support fourseasonsols com 800 533 0887 Optima Patio Cover Installation Guide...
Страница 4: ...www fourseasonsols com support fourseasonsols com 800 533 0887 Optima Patio Cover Installation Guide...
Страница 33: ...LifeRoom Optima Screen Installation Guide www fourseasonsols com support fourseasonsols com 800 533 0887...