PATIO COVER INSTRUCTION SHEETS
PATIO COVER INSTRUCTION SHEETS
LifeRoom Optima Installation Guide
STEP 5H:
Using a 4' level, plumb level
the front side of the Post while the
Post is set in front of the chaulkline.
Have the left male edge of roof panel
in line with the left end of the 3" Edge
Beam. Then, fasten the last section of
the roof panel to the 3" Edge Beam
using one #10x3/4 tek screw. Do not
anchor the Post bottom yet.
STEP 6A: Running the Roof
Panels & Pre-formed Flashing
Take
the third Roof Panel, starting on the
RIGHT end, having FEMALE lock on
the right side.
STEP 6B
Set the FEMALE lock on top
of the MALE lock of the first panel.
Raise both panels upward so the
bottoms almost touch making a V, then
slowly lower them to lock together.
Check to make sure they are locked
together, then slide the new Roof Panel
into the Hanging Channel tightly
against the Foam Weatherstripping.
Содержание LifeRoom Optima
Страница 1: ...LifeRoom Optima Installation Manual www fourseasonsols com support fourseasonsols com 800 533 0887...
Страница 3: ...www fourseasonsols com support fourseasonsols com 800 533 0887 Optima Patio Cover Installation Guide...
Страница 4: ...www fourseasonsols com support fourseasonsols com 800 533 0887 Optima Patio Cover Installation Guide...
Страница 33: ...LifeRoom Optima Screen Installation Guide www fourseasonsols com support fourseasonsols com 800 533 0887...