15
F15
STEP 7
7a
Insert 3 (three) FISCHER plugs into the holes
made as described in point
6a
.
7b
Hang up the extractor hood as described in
point
4a
.
ATTENTION!
Check the position of the extractor hood again
with a level.
Regulate any misalignment with the screw as
described in point
4a
.
7c
Fix the extractor hood in place with the screws
and washers.
7d
Allow the tube to slight within the stack towards
the upper bracket and lock it in place with the
two screws T inserted inside the bracket (use a
flat-tipped screw driver)
ATTENTION!
Prior to operation 7d
:
- Connect the exhauster with a 120 mm int.
exhaust pipe.
Use the supplied 150 to 120 mm plastic re-
duction.)
- Connect the power flex to the electricity main.
Fig. 7
T
T
Содержание PITAGORA 2439.001
Страница 2: ......
Страница 19: ...19 F15...