24
(g) Load percentage before fault: LLL
LLL is maximum of W% or VA%. VA% is a percent of maximum VA. W% is a percent of
maximum real power.
(h) O/P current before fault: CCC
CCC is a percent of maximum current.
(i) Positive Bus voltage before fault: PPP
P is an integer number ranging from 0 to 9. The unit is volt.
(j) Negative Bus voltage before fault: NNN
N is an integer number ranging from 0 to 9. The unit is volt.
(k) Battery voltage before fault: BBB.B
B is an integer number ranging from 0 to 9. The unit is volt
(l) Temperature before fault: TT.T
T is an integer number ranging from 0 to 9. The unit is degree in centigrade.
(m) UPS running status before fault: <b7b6b5b4b3b2b1b0>
<b7b6b5b4b3b2b1b0> is one byte of binary information.
Each bit is transferred into ASCII code.
<bn> is a binary number “0” or “1”.
Bit
Remarks
7
1:DCTODC on
6
1:PFC on
5
1: INVERTER on
4
Reserved(always 0)
3
1:input relay on
2
1:O/P relay on
1
Reserved(always 0)
0
Reserved(always 0)
Example:
Computer: QF<cr>
UPS: (04 208 41.0 160 50.0 102 100 160 190 041.0 69.0 01101100<cr>
Means: Inverter fault in line mode
I/P voltage is 208V.
I/P frequency is 41.0HZ.
O/P voltage is 160V.
O/P frequency is 50.0HZ
Load is 102%
O/P current is 100%
Positive Bus voltage is 160V
Negative Bus voltage is 190V
Battery voltage is 41.0V.
Temperature is 69.0
B
Battery SW off, PFC on , INVERTER on, input relay on , O/P relay on
Содержание EL-10K
Страница 1: ...1 SERVICE MANUAL ELIPSE SERIES EL 6K EL 6KS EL 10K EL 10KS FORZA POWER TECHNOLOGIES...
Страница 18: ...18 Figure 4 5 EL6KS EL10KS UPS configuration diagram...
Страница 41: ...41 5 4 3 Quick Problem Identification process Figure 5 4 3 1 Quick problem identification process...
Страница 50: ......
Страница 51: ...51...