![Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/fortress-technologies/pure-view-glass-baluster-for-fe26-steel/pure-view-glass-baluster-for-fe26-steel_installation-instructions-manual_2322447034.webp)
34
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
1. Use Spring Punch to mark the holes.
As shown in Fig. 1.
2. Drill out holes with a 3/16” drill bit.
As shown in Fig. 2.
3. Use T-25 screws to attach the UB or CB base to the post.
Begin with top hole then bottom. As shown in Fig. 3.
4. Keep bracket base centered as you install second screw.
5. Insert barrel & screw to re-assemble bracket.
6. Tighten barrel & screw. As shown in Fig. 4 & 5.
7.
Use
T-25 screws to attach UB Bracket to UB Adapter.
As shown in Fig. 6.
Step 4:
Top Bracket Installation Continued (UB or CB)
Fig. 1
Fig. 2
Fig. 3
Fig. 6
Fig. 4
UB-05 Stair
Bracket
Содержание PURE VIEW GLASS BALUSTER FOR Fe26 STEEL
Страница 15: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 15 Fig 3 Fig 4 ...
Страница 27: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 27 ...
Страница 39: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 39 ...
Страница 44: ...BALAUSTRE DE VIDRIO PURE VIEW PARA Fe26 STEEL INSTRUCCIONES DE INSTALACIÓN Pure View ...
Страница 57: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 57 Fig 3 Fig 4 ...
Страница 69: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 69 ...
Страница 81: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 81 ...
Страница 99: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 99 Fig 3 Fig 4 ...
Страница 111: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 111 ...
Страница 123: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 123 ...