PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
25
Step 4:
Install CB-05 Angled Brackets
1. Attach Angle Bracket Base piece to the posts with supplied
T-25 thread-cutting screws. Use low speed setting on drill.
As shown in Fig. 1.
2. Assemble Angle Bracket Body piece & Base piece.
As shown in Fig. 2.
Tip:
• Use a Bit Extender for an easier drilling process.
Fig. 1
Fig. 2
Step 5:
Determine Panel Length
1. Check to ensure that all posts are square and straight. Shim
posts as required.
2.
Ensure that the Angle Bracket Cups are approximately
aligned.
3. With another person’s help, measure the distance from the
inside back of one cup to the inside back of the other cup.
This will be the panel length. As shown in Fig. 2.
Fig. 1
CB-05 Angled Bracket
UB-05 Angle Bracket
Содержание PURE VIEW GLASS BALUSTER FOR Fe26 STEEL
Страница 15: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 15 Fig 3 Fig 4 ...
Страница 27: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 27 ...
Страница 39: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 39 ...
Страница 44: ...BALAUSTRE DE VIDRIO PURE VIEW PARA Fe26 STEEL INSTRUCCIONES DE INSTALACIÓN Pure View ...
Страница 57: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 57 Fig 3 Fig 4 ...
Страница 69: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 69 ...
Страница 81: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 81 ...
Страница 99: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 99 Fig 3 Fig 4 ...
Страница 111: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 111 ...
Страница 123: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 123 ...