20
PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
ANGLE BRACKET
Pure View: Fe
26
Glass Baluster Angled Bracket Installation
Options
Ball Cap
UB-05 Cap
Pressed Dome Cap
Base Cover
UB-05 Cup
3-3/4” [95.5mm] I-Support
3-3/4”
[95.5mm]
2” X 2” & 3” X 3”
[51mm x 51mm] &
[76mm x 76mm]
Iron Posts with base
Pure View: Steel Rail
69-1/2”[1765.5mm]
Universal Bracket (UB) Adapter
*Installed heights include a
3-3/4” [95.5mm] space between deck surface
and bottom edge of bottom rail.
34” [864mm]
40” [1016mm]
38-1/16” [967mm]
43-7/8” [1114mm]
39-1/2” [1003mm]
45-1/2” [1156mm]
Universal Bracket (UB) Adapter Post Configuration
Fe
26
Pure View Baluster
Panel Height
Rail Panel
Installed Panel Height*
Required Post
UB-05 Angle Adapter
Pure View Glass Baluster
Содержание PURE VIEW GLASS BALUSTER FOR Fe26 STEEL
Страница 15: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 15 Fig 3 Fig 4 ...
Страница 27: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 27 ...
Страница 39: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 39 ...
Страница 44: ...BALAUSTRE DE VIDRIO PURE VIEW PARA Fe26 STEEL INSTRUCCIONES DE INSTALACIÓN Pure View ...
Страница 57: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 57 Fig 3 Fig 4 ...
Страница 69: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 69 ...
Страница 81: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 81 ...
Страница 99: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 99 Fig 3 Fig 4 ...
Страница 111: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 111 ...
Страница 123: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 123 ...