![Fortress Technologies PURE VIEW FULL GLASS PANEL AL13 HOME Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/fortress-technologies/pure-view-full-glass-panel-al13-home/pure-view-full-glass-panel-al13-home_installation-instructions-manual_2322445009.webp)
9
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Step 1:
Mark Bracket Hole Locations
1. Mark the centerline of each post with a pencil.
2. Take measurements used in Fig. 1 and 2 to mark bottom
and top bracket hole locations onto posts.
BRACKET INSTALLATION
Fig. 1
Bracket Hole Locations
Pre-drill Dimensions: Pre-drilling with a 3/16”[4.5mm] drill bit is required
4” [101.5mm]
A*
3/8” [10mm]
B
3/8” [10mm]
35
-
3/16” [894mm]
C
41 1/4” [1048mm]
11/16” [17mm]
D
*Dimension A positions bottom edge of rail (1)
3-1/2” [89mm] and (2)
2” [51mm]
above deck surface.
*Dimension A is measured from the bottom surface of post base.
2-1/2”[63.5mm]
11/16” [17mm]
32-1/2” [825.5mm] Panel
40” [1016mm] Panel
Fig. 2
B
C
B
A
B
D
(1)
(2)
Fig. 1
Fig. 2
Shim post as needed to
ensure post is level
Deck Board
Rim
Jois
t
Joist / Blocking
Wood Block
1/2”
[12.5
mm
]
A