14
PURE VIEW: Al
13
HOME FULL GLASS PANEL INSTALLATION
Fig. 1
Straight
Bracket
Cup
Al
13
HOME Vertical Cable/
Pure View I-Support
Straight
Bracket
Cup
Fig. 2
Step 3:
Install Full Glass Into Bottom Rail
1. Carefully position full glass sheet into the center of the
bottom rail. As shown in Fig. 1.
2. Insert spacers on either side of the glass in the bottom
rail. Spacer will be flush with the side of the glass.
As shown in Fig. 2.
Tip:
•
Be sure to wear safety gloves & glasses when handling
glass.
Set
Screw
Tip:
• It is recommended to apply a small amount of liquid soap
to the black gasket openings in the top and bottom rails
before installing Full Glass. As shown in Fig. 3. The Liquid
Soap helps the glass settle in place.
Fig. 3