10
FENCING INSTALLATION: EVOLVER
Fig. 2
Gravel
Concrete
Post Base
SECTION VIEW
11-13/16”
[300mm] Max
Check
Local Code
above ground. Be sure to check that posts are aligned
along guide strings & positioned correctly.
7. Pour concrete into holes and let it settle.
As shown in Fig. 2.
8. As concrete settles, Use a level to confirm that each post
base is mounted straight at a 90
o
degree angle.
Note:
• Some boundary lines may have service lines, electrics and
sewerage lines, that may run across them. You should
check to confirm that you are not digging into them.
Fig. 1
Max.
Post Base Spacing is
73” [1860mm ].
Fence Board Width is
70-1/2” [1791mm].
Ground Stake
Guide String
Post Base
Step 2:
Mount Post (Embedded/No Foundation)
1. Reference Post Mounting instructions on page 8, step 2.
HOUSE