Step 4: Left and Right Handrail Arm, Meter Post Installation
•
Insert the Right Handrail Arm
(4)
on the tube of the Right Handrail
(5)
with x2
M8x40 Carriage Bolts
(29)
, x2 Ø20xØ8x1.5 Curve Washers
(30)
and x2 M8 Cap
Nuts
(31)
.
•
Repeat the same procedure to assemble the Left Handrail Arm
(3)
.
•
Connect the Sensor Wire
(19)
with the Extension Sensor Wire
(13)
.
•
Remove x2 M8x16 Hexagon Bolt
(15)
and x2 Ø16xØ8x1.5 Curve Washers
(16)
from
the Main Frame
(1)
.
•
Attach the Meter Post
(2)
onto Main Frame
(1)
with removed x2 M8x16 Hexagon
Bolt
(15)
and x2 Ø16xØ8x1.5 Curve Washers
(16)
. Tighten using the Allen Wrench
provided.
•
Remove x2 M5x10 Cross Pan Head Screws
(12)
from the Display
(11)
.
•
Then attach the Display
(11)
onto the top end of Meter Post
(2)
with x2 removed
M5x10 Cross Pan Head Screws
(12)
. Tighten screws using the Spanner with Phillips
Screwdriver provided. Connect the Meter Wire
(
11)
with the Middle Wire
(13)
.
Содержание AEXR-270
Страница 1: ...27 FAN RESISTANCE EXERCISE AIR BIKE AEXR 270 FSFNARBK27A...
Страница 2: ......
Страница 5: ...OVERVIEW...
Страница 11: ...Tools Allen Wrench S5 Allen Wrench S6 Spanner S10 S13 S17 S19 Spanner with Phillips Screwdriver S13 S14 S15...
Страница 14: ...Tools Allen Wrench S6 Spanner with Phillips Screwdriver S13 S14 S15...