BEARERS & FLOOR PANELS
Lay the bearers down and spread them out roughly
ready to position the floor panels on top.
Ensure the panel is flush around the edges to the
first bearer. Ensure the floor panels on the bearers
are level using a spirit level as a guide.
3
3
55
11
22
Pre-drill for every process before securing with
screws. Pre-drill 5 holes along the edge of the first
floor panel. Do not screw in the other side at the
moment.
Using 125mm screws, screw through the floor
panel into the floor bearer beneath. Repeat the
process for the 4 other screws. Ensure each screw
is countersunk.
Place the second floor panel (E) onto the middle
bearers. Ensure the panel is positioned half way on
both bearers.
Place the first floor panel (D) on top of the two
bearers and position it half way onto the second
bearer. The black side covered in tar will be on top
of the bearers as shown above.
4
4
66
5