715.5mm
783mm
912mm
10x6
8x6
980mm
1010mm
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
7
3b
DOOR STRIPS
4b
ROOF SHEETS PREPARATION
4a
ROOF BEAM(S)
Centralise the Top Weather Strip
onto the
Door Weather Strips.
Screw into place.
All 3
strips will overhang into the door way.
Secure the Door Hinge Strips.
Ensure they are
in contact with the door batten and against the
Door Weather Strips
.
Attach the Canopy Strip.
Ensure it is screwed
to the front panels frame.
Attach the Kick
Plate Strip.
Ensure it is flush to the batten.
Before placing the OSB Roof Sheets onto the roof,
screw the 2 x Roof Strips
along the edge
of the OSB Roof Sheets as shown below. Repeat the process for both ends.
Please refer to the
assembly step which suits your summerhouse size.
(7x5 only). Screw 1 x Side Roof Strip at each
side
along the other edge of the OSB Roof
Sheets as shown below. Ensure they are central.
Attach a Z-brackets
onto the face at both
ends of your Beam(s) as shown below. The
Z-brackets will mould into shape once secured
to the front and back panels framework.
For the
7x5,
you will have only one beam.
Screw the Z-brackets to the centre of the front and
back panels
using the measurement as shown below.
For the
8x6
&
10x6,
you will have two beams
Screw the Z-brackets to the front and back panels
using the measurements as shown below.
TOP WEATHER STRIP
DOOR HINGE STRIPS
END ROOF STRIP
ROOF BEAM
KICK PLATE STRIP
CANOPY STRIP
KICK PLATE STRIP
Z-BRACKET
7X5
8X6 & 10X6
END ROOF STRIP
SIDE ROOF STRIP
7X5
8X6 & 10X6
7X5