50mm
DOOR FACE
PIN IN LINE
WITH DOOR
FACE
DOOR
150mm
5mm
150mm
150mm
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
8
Allow a 5mm gap at the top
when fitting the door.
6a
DOOR HINGES
5
ROOF FELT & FASCIAS
Make sure the inner edge of the pin on the
hinge is in line with the door face.
Attach 3 hinges to the door frame.
Use the
measurement provided below for positioning
the bottom hinge. Please take note of the
hinge position.
Place the door into the opening, ensuring it
is level.
Make sure the hinges are up against
the Door Weather Strip face. Secure the hinges
in place.
Measure out 2/3 equal lengths of felt.
Overlap
it on the top and around the edges.
Fold at the
corners
.
Tack to keep secure.
Ensure 50mm
of the felt covers the Roof Strips. Tack from the
bottom to the top.
Secure the Fascias
with screws as shown below. Ensure to screw into the Roof Strips.
Please refer
to the assembly step which suits your summerhouse size.
FRONT FASCIAS
DOOR
TOP TIP:
Use a measuring tape to measure out
2/3 equal lengths & cut with a sharp knife. Hammer the
tacks into the felt. Add the tacks at 150mm intervals.
4c
(8x6 & 10x6 only). Screw 2 x Side Roof Strips
at each side
along the other edge of the OSB
Roof Sheets as shown below.
Secure the OSB Roof Sheets
to the Roof Beam(s), Apex Section frames and wall panel frames as
shown below. Ensure to screw into the Roof Beams underneath. Use 8 x screws per OSB sheet.
Please refer to the assembly step which suits your summerhouse size.
HINGE POSITION
ROOF ASSEMBLY
7X5
8X6 & 10X6
TOP TIP:
Mark the OSB sheet and draw a line to ensure you drill and screw into the framing & beam(s).
SIDE ROOF STRIP
7X5
8X6 & 10X6
7X5
8X6 & 10X6
SIDE FASCIAS
SIDE FASCIAS
FRONT FASCIAS
8X6 & 10X6