SET-UP
Please follow these step-by-step procedures. Set-up time will be about ½ hour.
Leveling your unit
Thoroughly inspect the site location. The site should be level and have proper access to
water and electricity. Consider proper facing of the unit for convenient access and adequate
drainage.
After positioning the unit, block the wheels prior to disconnecting from the tow vehicle.
Level the unit from front to back using the front tongue jack. Level the unit side to side by
using the scissor jacks located on each corner.
When setting up the trailer for use, it is important that the stabilizer jack on each corner be
lowered and the trailer leveled. Levels are located on each side of the trailer near the wheel
fenders and on the front and back of the trailer. The levels have been applied to indicate
level when the trailer is actually tilted slightly to the rear, roadside corner. This is to allow
air conditioner condensation to run off that corner rather than over the doorways and for
waste drainage to the Waste Water Tank.
Step Assembly – Century Series
(Tools required: 9/16” Box wrench & Ratchet with 9/16” Socket)
**Do not unlock doors until porches are down and railings are installed**
Release rubber latch under step
Unbolt step latch from trailer
Carefully extend and lower step. Watch for pinch points
Place sand pad under step legs
Remove Thumbscrew from rail tube
Insert railing tube & secure with Thumbscrew
Fasten railing to trailer at bracket
Repeat for other railing
Secure by tightening thumb screws
Содержание CENTURY ADA +1
Страница 1: ...OPERATING MANUAL Mobile Restroom Trailer Forest River Cargo 3731 California Road Elkhart IN 46514...
Страница 9: ......
Страница 26: ......