Assembly steps
Steps
No.
Name
QTY
project
number
Name
QTY
13
No.7
Upper beam assembly
1
A
M10*100 hexagon socket
flat head screws
4
G
Ø10 flat gasket
4
F
M10 lock nut
4
Tools/equipment
No. 6 hexagon socket screwdriver, wrench
As shown in the picture, install the upper beam assembly.
20