![Force USA F-F50 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/force-usa/f-f50/f-f50_user-manual_2317085016.webp)
Assembly steps
Steps
No.
Name
QTY
project
number
Name
QTY
9
No.9
Sliding sleeve Cross set
right
1
G
Ø10 flat gasket
4
No.10
Sliding sleeve Cross set
Left
1
F
M10 lock nut
4
No.38
Stainless steel conduit
2
B
M10*70 hexagon socket
flat head screw
4
Tools/equipment
No. 6 hexagon socket screwdriver, wrench
The lettering surfaces of the regulating tube are installed facing inwards, the lettering sequence is from
bottom to top, and the left and right adjustment groups are assembled in the same way. Pay attention to
distinguish between No. 9 and No. 10.
16
Содержание F-F50
Страница 1: ...USER MANUAL F F50...