![Fondital LINE Tech Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/fondital/line-tech/line-tech_installation-use-and-maintenance-manual_2315360027.webp)
27
3.2.7.2. Measurement procedure
The boiler is equipped with a tower allowing for air intake/flue gas discharge duct connection (fig. 18 and 19). The tower is designed with
two pre-arranged openings directly accessing combustion air and flue gas ducts (fig. 19).
Remove cap A from the pre-arranged openings on the tower, before starting combustion checking procedure (fig. 18).
In order to verify combustion performance the following measurements must be implemented:
- assess combustion air from no. 1 opening (fig. 19).
- assess flue gas temperature and CO
2
from no. 2 opening (fig. 19).
Allow the boiler to reach working temperature before performing any measurement.
fig. 17
fig. 16
1
3
2
fig. 18
fig. 19
A
2
1
Содержание LINE Tech
Страница 1: ...IST 03 C 397 02 INSTALLATION USE AND MAINTENANCE NIAS CONDENSING GB...
Страница 39: ...39...