Fondital CAPRI B Скачать руководство пользователя страница 18

18

19

TFD version (types B23, C53 and C83) 

The heating unit, TFD version (types B23, C53 and C83) has a fe-
male fitting at its back, with an 80 mm lip seal for connection to a 
combustion  air  intake  pipe.  The  pipe  is  already  connected  to  the 
burner via a flexible paper-aluminum duct. 
Combustion air can be taken from outside the room in which the 
heating unit is installed by means of a suitable pipe.
Maximum length of the combustion air pipe is specified in the fol-
lowing technical data charts.

Flue gas discharge system is to be implemented by means of 120 
mm diameter pipes, vertical and horizontal, and wall terminal when 
laws and regulations allow it; maximum length of the flue gas pipe 
is specified in the following technical data charts.

When bends are necessary in the combustion air system, bear in 
mind that a wide radius 90° bend, in term of load losses, is equiva-
lent to a 1 meter long straight section of pipe, and a narrow radius 
90° bend is equivalent to a 1.5 meter long straight pipe.

N.B.
Only enameled steel or stainless steel pipes with gaskets from 
the manufacturer or available on the market, are to be used as 
flue gas discharge system. 
In presence of vertical flue gas discharge pipes, provide a spe-
cific section for condensate discharge. 
All the installations (both TF and TFD versions), require a spe-
cific section linked to the flue gas discharge pipe, allowing for 
measurement of flue gas temperature and CO2 concentration, 
so that the burner can be correctly adjusted and the combu-
stion efficiency verified. 

N.B.
When  routing  through  flammable  walls,  provide  the  flue  gas 
discharge pipes with suitable thermal insulation (50 mm mini-
mum thickness).

N.B.
When flue gas is discharged through 120 mm diameter pipes, 
it is mandatory to install on the air intake pipe the provided 80 
mm diameter terminal.

Types and classification of air intake and flue gas discharge systems

Type B23 

Discharge through the wall (when allowed by applicable installation 
standards) or through the roof or via chimney system dedicated to 
the boiler only.

Type C53

The air intake terminal and flue gas discharge terminal are never to be 
positioned on opposite walls.

Model 23

Max equivalent length of discharge pipe Ø 120 mm: 7 meters 

Each added wide radius 90° equals 1 meter discharge

Each added narrow radius 90° equals 1.5 meter discharge

Model 33 

Max equivalent length of discharge pipe Ø 120 mm: 9 meters 

Each added wide radius 90° equals 1 meter discharge

Each added narrow radius 90° equals 1.5 meter discharge

Model 43

Max equivalent length of discharge pipe Ø 120 mm: 5 meters 

Each added wide radius 90° equals 1 meter discharge

Each added narrow radius 90° equals 1.5 meter discharge

Model TFD 23

Air intake equivalent length 

of Ø 80 mm pipe

Flue gas discharge equivalent length 

of Ø 120 mm pipe

From 0 to 4 meters

Up to 7 meters

From 4 to 6 meters

Up to 9 meters

From 6 to 8 meters

Up to 11 meters

Each added wide radius 90° equals 1 meter both in air intake and flue gas discharge

Each added narrow radius 90° equals 1.5 meter both in air intake and flue gas discharge

Model TFD 33

Air intake equivalent length 

of Ø 80 mm pipe

Flue gas discharge equivalent length 

of Ø 120 mm pipe

From 0 to 6 meters

Up to 9 meters

From 6 to 7 meters

Up to 11 meters

Each added wide radius 90° equals 1 meter both in air intake and flue gas discharge

Each added narrow radius 90° equals 1.5 meter both in air intake and flue gas discharge

Model TFD 43

Air intake equivalent length 

of Ø 80 mm pipe

Flue gas discharge equivalent length 

of Ø 120 mm pipe

From 0 to 5 meters

Up to 5 meters

From 5 to 6 meters

Up to 8 meters

From 6 to 7 meters

Up to 10 meters

Each added wide radius 90° equals 1 meter both in air intake and flue gas discharge

Each added narrow radius 90° equals 1.5 meter both in air intake and flue gas discharge

Содержание CAPRI B

Страница 1: ...CAPRI B R IST 03 C 217 01 INSTALLATION USE AND MAINTENANCE GB...

Страница 2: ...Dear Customer thank you for choosing our boilers Please read these installation use and maintenance instructions with care...

Страница 3: ...es All the packaging materials can be recycled and should be sent to specific waste management sites Keep the packaging out of the reach of children as it constitutes a serious hazard In the event of...

Страница 4: ...imensions page 14 2 3 Heating unit layout page 15 2 4 Technical data of the heating units page 16 2 5 Technical data of the burner page 16 3 Instructions for the installer page 17 3 1 Installation reg...

Страница 5: ...d is flashing B and BV models only the temperature probe 2 cylinder is faulty inter rupted or out of range The heating unit keeps operating in CH mode DHW supply is halted As soon as the faulty probe...

Страница 6: ...nd BV models or through the adjustable thermo stat on the cylinder Temperature range is 35 C 65 C in B and BV models in R and RV models it is depending on the type of cylinder optional equipment The p...

Страница 7: ...s the boiler is active The unit heats the cylin der up to the temperature set via knob 12b B and BV models or via the adjustable thermostat on the cylinder when a cylinder was installed R and RV model...

Страница 8: ...h Comfort position All functions are active CH DHW ANTI FROST PUMP ANTI LOCKING ANTI LEGIONELLA Channel 1 of the programmable timer is considered always ON re gardless of the set program therefore CH...

Страница 9: ...r the bottom of the chart NOTE TO THE FITTER The fictitious room temperature set by the user through knob 13b is more precise when the SLIDING TEMPERATURE curves are set correctly Such curves are to b...

Страница 10: ...eriods can be set a total of 16 In order to set a start program follow the instructions below press button 1 7 in order to set the desired week day or days 1 press button h and button m to set hour an...

Страница 11: ...UTO It is possible to permanently activate one channel and permanently de activate the other Proceed as follows position selector 1 to I press button 6 once to select channel 1 twice for channel 2 the...

Страница 12: ...ssure by acting upon the loading tap pic 5 located in side the heating unit In order to restore proper water pressure proceed as follows turn the main switch 16 pic 1 to O the green light turns off re...

Страница 13: ...tem and 24 kW thermal output TFD 33 sealed chamber heating unit with split air ue gas system and 33 kW thermal output TFD 43 sealed chamber heating unit with split air ue gas system and 43 kW thermal...

Страница 14: ...NI01 VA version 5 LOW TEMP FLOW VA version G1 M 10 FUEL INLET Models R and RV Models B and BV D mm TF 150 TFD 120 1 FLOW G1 M 6 HIGH TEMP FLOW BV version G1 M 2 RETURN G1 M 7 HIGH TEMP RETURN BV versi...

Страница 15: ...ater Domestic hot water REMOTE CONTROL or CYLINDER PROBE ZONA 1 HIGH TEMPERATURE TS S1 MODEL B PR CH PUMP PS DHW PUMP TS LIMIT THERMOSTAT TA1 ROOM THERMOSTAT OPTIONAL TA 1 TS HEATING UNIT PROBE EXTERN...

Страница 16: ...0 5 0 5 0 5 CH temperature range C 50 82 50 82 50 82 Max CH operating pressure bar 3 3 3 CH expansion vessel capacity l 12 12 12 DHW expansion vessel capacity l 5 5 5 DHW temperature range C 35 57 35...

Страница 17: ...securing the base to the wooden pallet in order to remove the wooden pallet from the heating unit it is necessary to raise it proceed carefully insert two ropes or cables under the base front rear wis...

Страница 18: ...minal Types and classi cation of air intake and ue gas discharge systems Type B23 Discharge through the wall when allowed by applicable installation standards or through the roof or via chimney system...

Страница 19: ...y earth the system The DHW CH and fuel pipes are not suitable for grounding purposes 3 2 9 Hydraulic connections CENTRAL HEATING Before installing the heating unit we recommend you clean the sy stem t...

Страница 20: ...ted together with the power main cables Position the external probe on an outside wall facing North North East Do not install the probe in the windows areas near ventilation openings or heat sources I...

Страница 21: ...OM THERMOSTATS M6 CONNECTOR FOR TELE METERING M1 M24 AVAILABLE CONNECTIONS TA1 TA2 ZONE 1 ROOM THERMOSTAT AND ZONE 2 ROOM THERMOSTAT BOTH OPTIONAL EQUIPMENT TSM LOW TEMPERATURE ZONE THERMOSTAT SE EXTE...

Страница 22: ...D ZONE 2 ROOM THERMOSTAT BOTH OPTIONAL EQUIPMENT TSM LOW TEMPERATURE ZONE THERMOSTAT SE EXTERNAL PROBE CODE 0SAODAES01 CT PHONE PROGRAMMER OPTION FUSE 2AF 250Vac FUSE P4 POTENTIOMETER FOR HIGH TEMPERA...

Страница 23: ...V 0CIRCSTA05 MAIN ELECTRONIC BOARD M TERMINAL BOARD FOR CONNECTION TO POWER MAINS EXTERNAL PROBE ROOM THERMOSTATS M6 CONNECTOR FOR TELE METERING M1 M24 AVAILABLE CONNECTIONS TA1 TA2 ZONE 1 ROOM THERMO...

Страница 24: ...MODEL BV with REMOTE CONTROL 0CIRCSTA05 MAIN ELECTRONIC BOARD M TERMINAL BOARD FOR CONNECTION TO POWER MAINS EXTERNAL PROBE ROOM THERMOSTATS M6 CONNECTOR FOR TELE METERING M1 M24 AVAILABLE CONNECTIONS...

Страница 25: ...BE WITH CYLINDER MODEL R 0CIRCSTA05 MAIN ELECTRONIC BOARD M TERMINAL BOARD FOR CONNECTION TO POWER MAINS EXTERNAL PROBE ROOM THERMOSTATS M6 CONNECTOR FOR TELE METERING M1 M24 AVAILABLE CONNECTIONS TA1...

Страница 26: ...E METERING M1 M24 AVAILABLE CONNECTIONS TA1 TA2 ZONE 1 ROOM THERMOSTAT AND ZONE 2 ROOM THERMOSTAT BOTH OPTIONAL EQUIPMENT TSM LOW TEMPERATURE ZONE THERMOSTAT SE EXTERNAL PROBE CODE 0SAODAES01 CT PHONE...

Страница 27: ...djustement set a value between 3 and 4 NOTE SET THE BOILER JUMPER TO CM3 TO ON EXTERNAL CYLINDER MODEL RV 0CIRCSTA05 MAIN ELECTRONIC BOARD M TERMINAL BOARD FOR CONNECTION TO POWER MAINS EXTERNAL PROBE...

Страница 28: ...RATURE CN4 OFF 2 C THE REMOTE MANAGES ZONES 2 WHEN THE REMOTE CONTROL IS CONNECTED BOTH CHANNELS CH1 AND CH2 OF THE DIGITAL TIMER ARE ALWAYS TO BE ELECTRICALLY CLOSED MODEL RV with REMOTE CONTROL 0CIR...

Страница 29: ...datory to install a lter on the fuel oil supply pipe The burner pump is designed to operate in a twin pipe system In order to supply via a single pipe unscrew cap 2 and remove the grub screw 3 Afterwa...

Страница 30: ...ire adjustment Combustion air can be adjusted by turning the socket screw A shown in pic 15 The setting is shown on the relevant graduated scale B The oil pressure can be adjusted by turning screw 5 i...

Страница 31: ...18 pic 17 4 8 Burner ignition cycle The burner ignition cycle is shown in pic 19 chart In the event of shutdown the red light 7 on the control panel pic 1 comes on and the reset button C on the burner...

Страница 32: ...Optical resistence Solenoid valve Motor and condenser Burner earth Safety thermostat Limit thermostat Remote shutdown light 230V 0 5A max Ignition electrodes Optical resistence Solenoid valve Motor an...

Страница 33: ...terminal connections The burner performs pre purge correctly and then shuts down The optical resistance is dirty Clean it The optical resistance is faulty Replace it The flame goes out or does not lig...

Страница 34: ...rvice technicians T accurately trained personnel 6 1 Maintenance schedule Routine maintenance is to include the following general check and inspection of the heating unit check for leaks of the oil su...

Страница 35: ...isconnected Reconnect it Flow probe is faulty Replace it The heating unit has shut down the red shutdown light no 6 is flashing The unit will automatically resu me operation once the problem is solved...

Страница 36: ...tel 39 365 878 31 fax 39 365 878 576 email fondital fondital it www fondital it The manufacturer reserves the right to implement modifications to the products as required without affecting the basic f...

Отзывы: