background image

Recommended daily dispenser cleaning

1. Remove all debris from drain pan.

2. Pour 1 gallon (4L) hot water into drain pan to keep drain lines clear.

Recommended weekly dispenser cleaning

1. Remove drain pan and grille and wash with Solution A. Rinse thoroughly.

2. Remove nozzles and diffusers from valves, soak for at least 10 minutes in cleaning Solution A, rinse,

sanitize with Solution B and reinstall.

3. Pour a solution of one cup (8oz/237ml) household bleach mixed with one gallon (3.8L) hot water into

drain pan to help prevent algae growth in drain lines.

Recommended quarterly dispenser cleaning

1. Remove top from dispenser and turn power switch to OFF position.

2.  Remove ice from storage area.

3. Remove dispense chute cover, chute, auger motor assembly, auger and auger tube (see Service section).

4. Remove drain pan, grille and dispense wheel (see Service section).

5.  Clean all components and bin storage area with Solution A, rinse thoroughly with clear water and sanitize

with Solution B.

6. Remove nozzles and diffusers from valves, soak for at least 10 minutes in cleaning Solution A, rinse,

sanitize with Solution B and reinstall.

For units with integral ice-water bath beverage cooling only:

1. Remove dispenser lid and counter access panel opposite ice tower side.

2. Disengage service drain tube (on utility connection side of dispenser) from mounting bracket.

3. Pull bath service drain tube down through beverage line opening in counter and drain water bath into a bucket.

4. Use a bottle brush to clean coils with Solution A, rinse and sanitize with Solution B.

5. Reposition ice water bath drain tube in up position so water does not drain out.

6. Pour Solution A into ice water bath until it flows out of bath overflow drain.

7. Turn power ON to unit and dispense a small cup of ice to activate pump.

8. Allow pump to run for two minutes to clean pump and pump lines.

9. Turn power OFF.

10. Drain bath and replace drain tube in mounting bracket in up position to avoid siphoning water bath water.

Putting unit back in service after quarterly cleaning

1. On units with integral beverage cooling, fill ice water bath with water until water spills out of 

bath overflow drain.

2. Reassemble components.

3. For manual load units, fill unit with an approved ice (see important cautions on page 4). 

4. For automatic load units with 400A/W (R404A refrigerant) icemakers, turn bin signal switch(es) and

dispenser power switch to ON position and allow storage area to fill.

5. Dispense and discard all ice, verifying dispenser is functioning properly.

Recommended quarterly cleaning of optional icemaker.

Units equipped with optional icemakers require cleaning of icemaker system at least every six months, and more
often if local water conditions dictate. Failure to clean icemaker system will result in decreased performance and
potential damage to icemaker. Refer to Icemaker Installation, Operation and Service Manual.

10

Содержание VU155 Series

Страница 1: ...00119636R00 801 Church Lane PO Box D Easton PA 18044 USA Toll free 800 523 9361 610 252 7301 Fax 610 250 0696 www follettice com Following installation please forward this manual to the appropriate op...

Страница 2: ...d by customer service within 30 days after shipment 3 Follett receives the equipment at the factory in Easton PA within 30 days after issuance of the return authorization number 4 The equipment must b...

Страница 3: ...ge area of dispenser contains mechanical moving parts Keep hands and arms clear of this area at all times If access to this area is required power to unit must be disconnected first Ice is slippery Ma...

Страница 4: ...nser 3 4 PVC pipe nipple for bin drain 3 4 PVC pipe nipple for drain pan drain 1 ID hose for beverage bath drain Beverage connections 1 4 ID syrup beverage hose 3 8 ID carbonated water beverage hose 3...

Страница 5: ...nt View 37 25 17 432 mm 18 875 479mm 18 875 479mm ice transport tube 10 valve unit 947mm Manual load unit Dispenser with 1 optional auto fill icemaker kit s Dispenser with 2 optional auto fill icemake...

Страница 6: ...ad approximately 1 4 6mm in diameter of NSF listed silicone sealant Dow Corning RTV 732 or equivalent around perimeter of dispenser where it meets counter Smooth sealant to a 1 8 4mm radius 8 Install...

Страница 7: ...g instructions in service manual before operating dispenser 2 On units with Follett integral ice water bath beverage cooling B models only slowly pour water into ice water bath area to fill empty bath...

Страница 8: ...he icemaker off to avoid overfilling of the bin The icemaker will restart after 20 minutes if the bin is calling for ice Units with integral ice water bath beverage cooling are equipped with a water b...

Страница 9: ...s 23L of cleaning Solution A Fill a clean product tank with cleaning solution Fill a second clean product tank with potable rinse water 1 Disconnect all syrup lines from product containers 2 Connect s...

Страница 10: ...bracket 3 Pull bath service drain tube down through beverage line opening in counter and drain water bath into a bucket 4 Use a bottle brush to clean coils with Solution A rinse and sanitize with Solu...

Страница 11: ...auger tube removal Fig 3 1 Remove auger motor and dispense mechanism assembly see above 2 Pull auger upward to clear auger tube 3 Lift auger tube upward to clear dispenser top 4 Slide tube and bearin...

Страница 12: ...9 RED 6 T RED RED C NO 24VAC RED TEMP BATH SOL C DISPENSE SWITCH PL6 3 BROWN T1 RED PL6 1 RED 24 V RED 4 DISPENSE ORANGE L2 PURPLE RED CLOCKWISE ROTATION PL3 3 BLK WHT M2 BLUE WHEEL MOTOR L2 BLUE R2...

Страница 13: ...ed problem 6 Faulty or disconnected wiring Solution 1 Turn power switch to ON position check connections 2 Replace switch 3 Replace transformer 4 Check pan and reseat 5 Replace switch 1 Check connecti...

Страница 14: ...zed Ice will be dispensed into the water bath for 12 seconds then stop for 60 seconds The pump will stay energized and the circuit board will then monitor the water temperature If it is below the set...

Страница 15: ...key lock for valves 501409 Not shown Key beverage lock switch 501286 10 Panel end beverage RH unit 502584 Not shown Panel end beverage LH unit 502583 Not shown Panel access RH and LH units 502585 Not...

Страница 16: ...Dispense mechanism assembly bath LH unit 502449 Not shown Dispense mechanism assembly non bath RH unit 502458 Not shown Dispense mechanism assembly non bath LH unit 502496 7 Spring dispense mechanism...

Страница 17: ...hown Coil water carb 10 valve 00124701 7 Manifold carbonated water 8 valve 00207539 Not shown Manifold carbonated water 10 valve 00207540 8 Manifold water 8 valve 00123331 Not shown Manifold water 10...

Страница 18: ...auger 502476 6 Motor wheel 502560 Not shown Seal wheel motor 501333 Not shown Spacer wheel motor 501768 Not shown Capacitor wheel motor 501782 7 Agitator rotating 21 534mm long 502484 8 Plate wheel mo...

Страница 19: ...502477 3 Sprocket 35 22T 5 8 bore 502478 4 Sprocket 35 12T 5 8 bore 502479 5 Drive shaft 502480 6 Bearing auger upper and lower 501314 7 Cover and bearing chain drive includes 501314 502481 8 Capacit...

Страница 20: ...502500 Not shown Switch safety drain pan assembly RH unit 502501 Not shown Switch dispense lever 502505 Not shown Bracket safety switch rear 502608 Not shown Bracket safety switch drain pan RH 502609...

Отзывы: