12
Maestro Plus
Vision • RIDE Technology
6.
Transport tube installation
Incorrect ice transport tube installation can result in wet ice and dispensing problems. Follow guidelines below
to ensure correct installation. Call factory for assistance if you are unable to meet these requirements.
6.1
General requirements
§
Maximum length of tube run – 20 ft (6 m). Factory approval required for longer runs.
§
Run tube without dips.
§
One continuous length of tube; no splices.
§
Minimum radius of bends in tube – 6" (15.3 cm) inside radius.
§
Maximum number of bends – 6.
§
Insulation on entire run of ice tube.
6.2
Procedure
1. Install supplied insulation on entire length of tube.
2. Remove ice machine top panel.
3. Select side, rear or top knockout in ice machine cabinet for tube entrance and install bushing.
4. Run insulated tube without dips between dispenser and ice machine and secure in place.
5. Slide end of transport tube and insulation through bushing and run to nozzle.
6. Cut tube to that length.
7. Pull insulation back and slip supplied hose clamp over end of transport tube.
8. Heat end of transport tube in cup of 160 F (71 C) hot water to soften
➊
and spread with pliers
➋
before making connection to ease assembly.
9. Push transport tube onto nozzle
➌
.
10. Position clamp behind lip on nozzle and tighten clamp.
install insulation on full run of tube
Evaporator
install clamp behind lip
on nozzle
bushing
➌
Heat end of transport tube in cup of 160 F
(71 C) hot water to soften (
1) and spread with
pliers before making connection (
2).
➋
➊
SHUTTLE
ACTUATOR
To dispenser
Содержание Maestro Plus MCD425ABS
Страница 14: ...14 Maestro Plus Vision RIDE Technology...
Страница 15: ...Vision RIDE Technology Maestro Plus 15...